ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 74 results ...

Afolabi, A, Ibem, E, Aduwo, E, Tunji-Olayeni, P, Oluwunmi, O and Ayo-Vaughan, E (2022) Gauging parameters for e-procurement acquisition in construction businesses in Nigeria. International Journal of Construction Management, 22(03), 426-35.

Afshar, M R, Shahhosseini, V and Sebt, M H (2022) A genetic algorithm with a new local search method for solving the multimode resource-constrained project scheduling problem. International Journal of Construction Management, 22(03), 357-65.

Albattah, M A, Goodrum, P M, Littlejohn, R and Taylor, T R B (2022) A comparative analysis of the utilization of multiskilling among us Hispanic and non-Hispanic construction craft workers. International Journal of Construction Management, 22(03), 331-41.

Amadi, A I and Higham, A (2017) Latent geotechnical pathogens inducing cost overruns in highway projects. Journal of Financial Management of Property and Construction, 22(03), 269-85.

Annunen, P and Haapasalo, H (2022) Production capability creation (PCC) for collaborative construction projects: A qualitative study from Finland. Construction Economics and Building, 22(03), 1-20.

Anzagira, L F, Duah, D, Badu, E, Simpeh, E K and Marful, A B (2024) Stimulation strategies to promote green building uptake in developing countries: the case of Ghana. Journal of Engineering, Design and Technology, 22(03), 1012-29.

Ayat, M, Ullah, A and Kang, C (2024) The unsolicited proposal and performance of private participation infrastructure projects in developing countries. Journal of Engineering, Design and Technology, 22(03), 901-25.

Ball, Z, Cagan, J and Kotovsky, K (2024) Supporting management of new product development via a novel conceptual model: an interview driven approach. Journal of Engineering, Design and Technology, 22(03), 991-1011.

Bamgbade, J A, Nawi, M N M, Kamaruddeen, A M, Adeleke, A Q and Salimon, M G (2022) Building sustainability in the construction industry through firm capabilities, technology and business innovativeness: Empirical evidence from Malaysia. International Journal of Construction Management, 22(03), 473-88.

Bevan, E A M and Yung, P (2015) Implementation of corporate social responsibility in Australian construction SMEs. Engineering, Construction and Architectural Management, 22(03), 295-311.

Boadu, E F, Sunindijo, R Y, Wang, C C and Frimpong, S Y (2022) Health and safety integration into the procurement stages of public construction projects in developing countries: A case of Ghana. Construction Economics and Building, 22(03), 43-64.

Chiu, W Y B and Ng, F F (2015) Enhancement of organizational commitment through propensity to trust. Engineering, Construction and Architectural Management, 22(03), 272-94.

Chiu, W Y B and Ng, F F (2015) Enhancement of organizational commitment through propensity to trust. Engineering, Construction and Architectural Management, 22(03), 272-94.

Costantino, N and Pietroforte, R (2004) Note - Production arrangements by US building and non-building contractors: an update. Construction Management and Economics, 22(03), 231-5.

Dang, C N, Le-Hoai, L and Peansupap, V (2022) Linking knowledge enabling factors to organizational performance: Empirical study of project-based firms. International Journal of Construction Management, 22(03), 527-40.

Debela, G Y (2022) Critical success factors (CSFs) of public-private partnership (PPP) road projects in Ethiopia. International Journal of Construction Management, 22(03), 489-500.

Elghaish, F, Matarneh, S T and Alhusban, M (2022) The application of “deep learning” in construction site management: scientometric, thematic and critical analysis. Construction Innovation, 22(03), 580-603.

Elghaish, F, Matarneh, S T, Edwards, D J, Pour Rahimian, F, El-Gohary, H and Ejohwomu, O (2022) Applications of Industry 4.0 digital technologies towards a construction circular economy: gap analysis and conceptual framework. Construction Innovation, 22(03), 647-70.

Elghaish, F, Matarneh, S T, Talebi, S, Abu-Samra, S, Salimi, G and Rausch, C (2022) Deep learning for detecting distresses in buildings and pavements: a critical gap analysis. Construction Innovation, 22(03), 554-79.

Faris, H, Gaterell, M and Hutchinson, D (2022) Investigating underlying factors of collaboration for construction projects in emerging economies using exploratory factor analysis. International Journal of Construction Management, 22(03), 514-26.

Getuli, V, Capone, P, Bruttini, A and Sorbi, T (2022) A smart objects library for BIM-based construction site and emergency management to support mobile VR safety training experiences. Construction Innovation, 22(03), 504-30.

Ghodki, M K (2024) A new solar powered robotic arm guided master–slave electric motors of biomass conveyor. Journal of Engineering, Design and Technology, 22(03), 739-62.

Giritli, H and Oraz, G T (2004) Leadership styles: some evidence from the Turkish construction industry. Construction Management and Economics, 22(03), 253-62.

Goodrum, P M and Gangwar, M (2004) The relationship between changes in equipment technology and wages in the US construction industry. Construction Management and Economics, 22(03), 291-301.

Griffiths, R, Lord, W and Coggins, J (2017) Project bank accounts: the second wave of security of payment?. Journal of Financial Management of Property and Construction, 22(03), 322-38.

Hajirasouli, A, Banihashemi, S, Drogemuller, R, Fazeli, A and Mohandes, S R (2022) Augmented reality in design and construction: thematic analysis and conceptual frameworks. Construction Innovation, 22(03), 412-43.

Hamza, M, Shahid, S, Bin Hainin, M R and Nashwan, M S (2022) Construction labour productivity: Review of factors identified. International Journal of Construction Management, 22(03), 413-25.

Hwang, B-G, Zhao, X and Tan, L L G (2015) Green building projects: Schedule performance, influential factors and solutions. Engineering, Construction and Architectural Management, 22(03), 327-46.

Ibrahim, F S, Esa, M and Kamal, E M (2022) Strategies to minimise the impact of COVID-19 on the construction industry: A case study of construction site clusters in Malaysia. Construction Economics and Building, 22(03), 21-42.

Jacobsen, E L, Solberg, A, Golovina, O and Teizer, J (2022) Active personalized construction safety training using run-time data collection in physical and virtual reality work environments. Construction Innovation, 22(03), 531-53.

Jain, P, Tambuskar, D P and Narwane, V (2024) Identification of critical factors for big data analytics implementation in sustainable supply chain in emerging economies. Journal of Engineering, Design and Technology, 22(03), 926-68.

Jayalath, C and Perera, B A K S (2022) Exploring a shared comprehension between judicial approaches and scholar views pertaining to concurrent delays. International Journal of Construction Management, 22(03), 400-12.

Karthik, D and Kameswara Rao, C B (2022) Identifying the significant factors affecting the masonry labour productivity in building construction projects in India. International Journal of Construction Management, 22(03), 464-72.

Khan, A, Khan, M W A, Sorooshian, S, Ullah, M and Rana, F (2022) The mediating role of benefit management for sustaining the performance of infrastructure projects. Construction Economics and Building, 22(03), 124-43.

Kissi, E, Adjei-Kumi, T, Badu, E and Boateng, E B (2017) Factors affecting tender price in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 22(03), 252-68.

  • Type: Journal Article
  • Keywords: Construction industry; Structural equation modelling; Ghanaian; Partial least square; Tender price
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/JFMPC-09-2016-0044
  • Abstract:
    Purpose Tender price remains an imperative parameter for clients in deciding whether to invest in a construction project, and it serves as a basis for tender price index (TPI) manipulations. This paper aims to examine the factors affecting tender price in the construction industry. Design/methodology/approach Based on the literature review, nine independent constructs and one dependent construct relating to tender pricing were identified. A structured questionnaire survey was conducted among quantity surveyors in Ghana. Partial least squares structural equation modelling (PLS-SEM) examined the influences of various constructs on tender price development (TPD) and the relationships among TPD and TPI. Findings Results showed that cultural attributes, client attributes, contractor attributes; contract procedures and procurement methods; consultant and design team; external factors and market conditions; project attributes; sustainable and technological attributes; and TPI have a positive influence on tender price, whereas fraudulent attributes exert a negative influence. Practical implications The findings offer construction professionals broader understanding of factors that affect tender pricing. The results may be used in professional decision-making in the pricing of construction projects, as they offer clearer causal relations between how each construct will influence pricing. Originality/value This study adds to the body of construction pricing knowledge by establishing the relationships and degree of influences of various factors on tender price. These findings provide a valuable reference for practitioners.

Kissi, E, Adjei-Kumi, T, Badu, E and Boateng, E B (2017) Factors affecting tender price in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 22(03), 252-68.

Kissi, E, Agyekum, K, Baiden, B K, Reuben Agyei, T, Badu Eshun, B T and Badu, E (2022) Factors influencing tender pricing strategies of construction SMEs in Ghana. International Journal of Construction Management, 22(03), 387-99.

Kukah, A S K, Owusu-Manu, D G, Badu, E and Edwards, D J (2024) Reasons for entering into Ghanaian public-private partnership (PPP) power projects. Journal of Engineering, Design and Technology, 22(03), 854-78.

Kuoribo, E, Amoah, P, Kissi, E, Edwards, D J, Gyampo, J A and Thwala, W D (2024) Analysing the effect of multicultural workforce/teams on construction productivity. Journal of Engineering, Design and Technology, 22(03), 969-90.

Lü, X, Liu, Z, Lü, X and Wang, X (2024) Design and study on the leveling mechanism of the tractor body in hilly and mountainous areas. Journal of Engineering, Design and Technology, 22(03), 679-89.

Lam, T Y M and Siwingwa, N (2017) Risk management and contingency sum of construction projects. Journal of Financial Management of Property and Construction, 22(03), 237-51.

Lee, Y S, Rashidi, A, Talei, A, Arashpour, M and Pour Rahimian, F (2022) Integration of deep learning and extended reality technologies in construction engineering and management: a mixed review method. Construction Innovation, 22(03), 671-701.

Leung, M-Y, Ng, S T and Cheung, S-O (2004) Measuring construction project participant satisfaction. Construction Management and Economics, 22(03), 319-31.

Li, H, Xu, C, Cao, Y and Zhang, C (2024) What are the influencing factors of government’s trust decision-making on private sector in PPP projects: evidence from China?. Journal of Engineering, Design and Technology, 22(03), 813-35.

Lingard, H, Turner, M and Charlesworth, S (2015) Growing pains: Work-life impacts in small-to-medium sized construction firms. Engineering, Construction and Architectural Management, 22(03), 312-26.

Low, S P and Hongbin, J (2004) Estimation of international construction performance: analysis at the country level. Construction Management and Economics, 22(03), 277-89.

Lowies, B, Viljoen, C and McGreal, S (2017) Investor perspectives on property crowdfunding: evidence from Australia. Journal of Financial Management of Property and Construction, 22(03), 303-21.

Mahdi, I M, Khalil, A H, Mahdi, H A and Mansour, D M M (2022) Decision support system for optimal bridge' maintenance. International Journal of Construction Management, 22(03), 342-56.

Metham, M, Benjaoran, V and Sedthamanop, A (2022) An evaluation of green road incentive procurement in road construction projects by using the AHP. International Journal of Construction Management, 22(03), 501-13.

Minami, K (2004) Whole life appraisal of the repair and improvement work costs of Post Office buildings in Japan. Construction Management and Economics, 22(03), 311-8.

Mitropoulos, P and Tajima, V (2022) Constructability opportunities in the engineering design of marine pier structures: A case study. International Journal of Construction Management, 22(03), 366-78.

Moshood, T D, Rotimi, F E and Rotimi, J O B (2022) An integrated paradigm for managing efficient knowledge transfer: Towards a more comprehensive philosophy of transferring knowledge in the construction industry. Construction Economics and Building, 22(03), 65-98.

Mustaffa, N K, Isa, C M M, Ekundayo, D and Joseph, V R A (2022) Barriers and strategies for improving carbon emissions management approaches in Malaysian construction. Construction Economics and Building, 22(03), 99-123.

Nguyen, D C, Nguyen, T Q, Jin, R, Jeon, C H and Shim, C S (2022) BIM-based mixed-reality application for bridge inspection and maintenance. Construction Innovation, 22(03), 487-503.

Osuizugbo, I C, Okolie, K C and Oshodi, O S (2024) Factors supporting the implementation of buildability assessment as a tool for buildability improvement. Journal of Engineering, Design and Technology, 22(03), 879-900.

Oyegoke, A S and Al Kiyumi, N (2017) The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman. Journal of Financial Management of Property and Construction, 22(03), 286-302.

Quaigrain, R A, Owusu-Manu, D G, Edwards, D J, Hammond, M, Hammond, M and Martek, I (2024) Occupational health and safety orientation in the oil and gas industry of Ghana: analysis of knowledge and attitudinal influences on compliance. Journal of Engineering, Design and Technology, 22(03), 795-812.

Reyes Veras, P, Renukappa, S and Suresh, S (2022) Awareness of Big Data concept in the Dominican Republic construction industry: an empirical study. Construction Innovation, 22(03), 465-86.

S, E K and M.K, P (2024) Adaptive deep learning for deep COVID-19 diagnosis. Journal of Engineering, Design and Technology, 22(03), 763-94.

Sadeghineko, F and Kumar, B (2022) Application of semantic Web ontologies for the improvement of information exchange in existing buildings. Construction Innovation, 22(03), 444-64.

Sandanayake, M, Zhang, G and Setunge, S (2022) Impediments affecting a comprehensive emission assessment at the construction stage of a building. International Journal of Construction Management, 22(03), 453-63.

Shayan, S, Pyung Kim, K and Tam, V W Y (2022) Critical success factor analysis for effective risk management at the execution stage of a construction project. International Journal of Construction Management, 22(03), 379-86.

Sobuz, M H R, Meraz, M M, Saha, A, Akid, A S M, Hasan, N M S, Rahman, M and Safayet, M A (2024) Performance assessment of various seismic resistant systems for a multistory structure in different seismic zones of Bangladesh. Journal of Engineering, Design and Technology, 22(03), 718-38.

Sulaimon, I A, Alaka, H, Olu-Ajayi, R, Ahmad, M, Ajayi, S and Hye, A (2024) Effect of traffic data set on various machine-learning algorithms when forecasting air quality. Journal of Engineering, Design and Technology, 22(03), 1030-56.

Talebi, S, Wu, S, Al-Adhami, M, Shelbourn, M and Serugga, J (2022) The development of a digitally enhanced visual inspection framework for masonry bridges in the UK. Construction Innovation, 22(03), 624-46.

Tang, S L, Aoieong, R T and Ahmed, S M (2004) The use of process cost model (PCM) for measuring quality costs of construction projects: model testing. Construction Management and Economics, 22(03), 263-75.

Taniguchi, K, Kubota, S and Yasumuro, Y (2022) Quantitative visualization of physical barriers for vulnerable pedestrians based on photogrammetry. Construction Innovation, 22(03), 604-23.

Thakare, P and V, R S (2024) Advanced pest detection strategy using hybrid optimization tuned deep convolutional neural network. Journal of Engineering, Design and Technology, 22(03), 645-78.

Wang, S Q, Dulaimi, M F and Aguria, M Y (2004) Risk management framework for construction projects in developing countries. Construction Management and Economics, 22(03), 237-52.

Wild, A (2004) Re-interpreting the Building Industry Communications Research Project. Construction Management and Economics, 22(03), 303-10.

Yap, J B H and Shavarebi, K (2022) Enhancing project delivery performances in construction through experiential learning and personal constructs: Competency development. International Journal of Construction Management, 22(03), 436-52.

Zamani, S H, Rahman, R A, Fauzi, M A and Mohamed Yusof, L (2024) Government pandemic response strategies for AEC enterprises: lessons from COVID-19. Journal of Engineering, Design and Technology, 22(03), 690-717.

Zhao, X, Hwang, B-G and Low, S P (2015) Enterprise risk management in international construction firms: Drivers and hindrances. Engineering, Construction and Architectural Management, 22(03), 347-66.

Zulu, E, Zulu, S L, Chabala, M, Kavishe, N, Chifunda, C and Musonda, I (2024) Infrastructure design stage considerations for environmental sustainability in Zambia. Journal of Engineering, Design and Technology, 22(03), 836-53.