ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 74 results ...

Afolabi, A, Ibem, E, Aduwo, E, Tunji-Olayeni, P, Oluwunmi, O and Ayo-Vaughan, E (2022) Gauging parameters for e-procurement acquisition in construction businesses in Nigeria. International Journal of Construction Management, 22(03), 426-35.

Afshar, M R, Shahhosseini, V and Sebt, M H (2022) A genetic algorithm with a new local search method for solving the multimode resource-constrained project scheduling problem. International Journal of Construction Management, 22(03), 357-65.

Albattah, M A, Goodrum, P M, Littlejohn, R and Taylor, T R B (2022) A comparative analysis of the utilization of multiskilling among us Hispanic and non-Hispanic construction craft workers. International Journal of Construction Management, 22(03), 331-41.

Amadi, A I and Higham, A (2017) Latent geotechnical pathogens inducing cost overruns in highway projects. Journal of Financial Management of Property and Construction, 22(03), 269-85.

Annunen, P and Haapasalo, H (2022) Production capability creation (PCC) for collaborative construction projects: A qualitative study from Finland. Construction Economics and Building, 22(03), 1-20.

Anzagira, L F, Duah, D, Badu, E, Simpeh, E K and Marful, A B (2024) Stimulation strategies to promote green building uptake in developing countries: the case of Ghana. Journal of Engineering, Design and Technology, 22(03), 1012-29.

Ayat, M, Ullah, A and Kang, C (2024) The unsolicited proposal and performance of private participation infrastructure projects in developing countries. Journal of Engineering, Design and Technology, 22(03), 901-25.

Ball, Z, Cagan, J and Kotovsky, K (2024) Supporting management of new product development via a novel conceptual model: an interview driven approach. Journal of Engineering, Design and Technology, 22(03), 991-1011.

Bamgbade, J A, Nawi, M N M, Kamaruddeen, A M, Adeleke, A Q and Salimon, M G (2022) Building sustainability in the construction industry through firm capabilities, technology and business innovativeness: Empirical evidence from Malaysia. International Journal of Construction Management, 22(03), 473-88.

Bevan, E A M and Yung, P (2015) Implementation of corporate social responsibility in Australian construction SMEs. Engineering, Construction and Architectural Management, 22(03), 295-311.

Boadu, E F, Sunindijo, R Y, Wang, C C and Frimpong, S Y (2022) Health and safety integration into the procurement stages of public construction projects in developing countries: A case of Ghana. Construction Economics and Building, 22(03), 43-64.

Chiu, W Y B and Ng, F F (2015) Enhancement of organizational commitment through propensity to trust. Engineering, Construction and Architectural Management, 22(03), 272-94.

Chiu, W Y B and Ng, F F (2015) Enhancement of organizational commitment through propensity to trust. Engineering, Construction and Architectural Management, 22(03), 272-94.

  • Type: Journal Article
  • Keywords: Hong Kong; social exchange theory; organizational commitment; construction industry; employees attitudes; quantity surveying
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-04-2013-0029
  • Abstract:
    Purpose - The purpose of this paper is to investigate the perception of propensity to trust and organizational commitment of quantity surveyors and examine if propensity to trust among working partners enhances organizational commitment of quantity surveyors. Design/methodology/approach - Organizational commitment and propensity to trust is linked through the framework of social exchange. Quantitative approach with questionnaire survey is employed to investigate whether propensity to trust would enhance organizational commitment. Questionnaires are sent to the quantity surveyors who are professional members of the Hong Kong Institute of Surveyors and are working in the Hong Kong construction industry. In total, 71 valid responses are obtained for data analysis. Findings - Contrary to prediction, propensity to trust does not show significant relationship with both affective and continuance commitment. The two propensity to trust scales show different results on the relationship with normative commitment (NC). When working relationship is taken into consideration, quantity surveyor’s propensity to trust the partner who has the worst working relationship has significant and positive impact on the surveyor’s NC level; whilst quantity surveyor’s propensity to trust the partner who has the best working relationship does not has significant positive impact on the surveyor’s NC level. Practical implications - To improve propensity to trust among quantity surveyors, consultant companies should provide professional-related training programme to quantity surveyors as to explore their potential. The provision of training programs would also help quantity surveyors feel that they are supported by the organization, which would improve their commitment to the organization. Originality/value - This is the first study to apply the social exchange theory to study organizational commitment within the quantity surveying profession and construction industry, which provides a new point for understanding the concept amongst the profession and industry.

Costantino, N and Pietroforte, R (2004) Note - Production arrangements by US building and non-building contractors: an update. Construction Management and Economics, 22(03), 231-5.

Dang, C N, Le-Hoai, L and Peansupap, V (2022) Linking knowledge enabling factors to organizational performance: Empirical study of project-based firms. International Journal of Construction Management, 22(03), 527-40.

Debela, G Y (2022) Critical success factors (CSFs) of public-private partnership (PPP) road projects in Ethiopia. International Journal of Construction Management, 22(03), 489-500.

Elghaish, F, Matarneh, S T and Alhusban, M (2022) The application of “deep learning” in construction site management: scientometric, thematic and critical analysis. Construction Innovation, 22(03), 580-603.

Elghaish, F, Matarneh, S T, Edwards, D J, Pour Rahimian, F, El-Gohary, H and Ejohwomu, O (2022) Applications of Industry 4.0 digital technologies towards a construction circular economy: gap analysis and conceptual framework. Construction Innovation, 22(03), 647-70.

Elghaish, F, Matarneh, S T, Talebi, S, Abu-Samra, S, Salimi, G and Rausch, C (2022) Deep learning for detecting distresses in buildings and pavements: a critical gap analysis. Construction Innovation, 22(03), 554-79.

Faris, H, Gaterell, M and Hutchinson, D (2022) Investigating underlying factors of collaboration for construction projects in emerging economies using exploratory factor analysis. International Journal of Construction Management, 22(03), 514-26.

Getuli, V, Capone, P, Bruttini, A and Sorbi, T (2022) A smart objects library for BIM-based construction site and emergency management to support mobile VR safety training experiences. Construction Innovation, 22(03), 504-30.

Ghodki, M K (2024) A new solar powered robotic arm guided master–slave electric motors of biomass conveyor. Journal of Engineering, Design and Technology, 22(03), 739-62.

Giritli, H and Oraz, G T (2004) Leadership styles: some evidence from the Turkish construction industry. Construction Management and Economics, 22(03), 253-62.

Goodrum, P M and Gangwar, M (2004) The relationship between changes in equipment technology and wages in the US construction industry. Construction Management and Economics, 22(03), 291-301.

Griffiths, R, Lord, W and Coggins, J (2017) Project bank accounts: the second wave of security of payment?. Journal of Financial Management of Property and Construction, 22(03), 322-38.

Hajirasouli, A, Banihashemi, S, Drogemuller, R, Fazeli, A and Mohandes, S R (2022) Augmented reality in design and construction: thematic analysis and conceptual frameworks. Construction Innovation, 22(03), 412-43.

Hamza, M, Shahid, S, Bin Hainin, M R and Nashwan, M S (2022) Construction labour productivity: Review of factors identified. International Journal of Construction Management, 22(03), 413-25.

Hwang, B-G, Zhao, X and Tan, L L G (2015) Green building projects: Schedule performance, influential factors and solutions. Engineering, Construction and Architectural Management, 22(03), 327-46.

Ibrahim, F S, Esa, M and Kamal, E M (2022) Strategies to minimise the impact of COVID-19 on the construction industry: A case study of construction site clusters in Malaysia. Construction Economics and Building, 22(03), 21-42.

Jacobsen, E L, Solberg, A, Golovina, O and Teizer, J (2022) Active personalized construction safety training using run-time data collection in physical and virtual reality work environments. Construction Innovation, 22(03), 531-53.

Jain, P, Tambuskar, D P and Narwane, V (2024) Identification of critical factors for big data analytics implementation in sustainable supply chain in emerging economies. Journal of Engineering, Design and Technology, 22(03), 926-68.

Jayalath, C and Perera, B A K S (2022) Exploring a shared comprehension between judicial approaches and scholar views pertaining to concurrent delays. International Journal of Construction Management, 22(03), 400-12.

Karthik, D and Kameswara Rao, C B (2022) Identifying the significant factors affecting the masonry labour productivity in building construction projects in India. International Journal of Construction Management, 22(03), 464-72.

Khan, A, Khan, M W A, Sorooshian, S, Ullah, M and Rana, F (2022) The mediating role of benefit management for sustaining the performance of infrastructure projects. Construction Economics and Building, 22(03), 124-43.

Kissi, E, Adjei-Kumi, T, Badu, E and Boateng, E B (2017) Factors affecting tender price in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 22(03), 252-68.

Kissi, E, Adjei-Kumi, T, Badu, E and Boateng, E B (2017) Factors affecting tender price in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 22(03), 252-68.

Kissi, E, Agyekum, K, Baiden, B K, Reuben Agyei, T, Badu Eshun, B T and Badu, E (2022) Factors influencing tender pricing strategies of construction SMEs in Ghana. International Journal of Construction Management, 22(03), 387-99.

Kukah, A S K, Owusu-Manu, D G, Badu, E and Edwards, D J (2024) Reasons for entering into Ghanaian public-private partnership (PPP) power projects. Journal of Engineering, Design and Technology, 22(03), 854-78.

Kuoribo, E, Amoah, P, Kissi, E, Edwards, D J, Gyampo, J A and Thwala, W D (2024) Analysing the effect of multicultural workforce/teams on construction productivity. Journal of Engineering, Design and Technology, 22(03), 969-90.

Lü, X, Liu, Z, Lü, X and Wang, X (2024) Design and study on the leveling mechanism of the tractor body in hilly and mountainous areas. Journal of Engineering, Design and Technology, 22(03), 679-89.

Lam, T Y M and Siwingwa, N (2017) Risk management and contingency sum of construction projects. Journal of Financial Management of Property and Construction, 22(03), 237-51.

Lee, Y S, Rashidi, A, Talei, A, Arashpour, M and Pour Rahimian, F (2022) Integration of deep learning and extended reality technologies in construction engineering and management: a mixed review method. Construction Innovation, 22(03), 671-701.

Leung, M-Y, Ng, S T and Cheung, S-O (2004) Measuring construction project participant satisfaction. Construction Management and Economics, 22(03), 319-31.

Li, H, Xu, C, Cao, Y and Zhang, C (2024) What are the influencing factors of government’s trust decision-making on private sector in PPP projects: evidence from China?. Journal of Engineering, Design and Technology, 22(03), 813-35.

Lingard, H, Turner, M and Charlesworth, S (2015) Growing pains: Work-life impacts in small-to-medium sized construction firms. Engineering, Construction and Architectural Management, 22(03), 312-26.

Low, S P and Hongbin, J (2004) Estimation of international construction performance: analysis at the country level. Construction Management and Economics, 22(03), 277-89.

Lowies, B, Viljoen, C and McGreal, S (2017) Investor perspectives on property crowdfunding: evidence from Australia. Journal of Financial Management of Property and Construction, 22(03), 303-21.

Mahdi, I M, Khalil, A H, Mahdi, H A and Mansour, D M M (2022) Decision support system for optimal bridge' maintenance. International Journal of Construction Management, 22(03), 342-56.

Metham, M, Benjaoran, V and Sedthamanop, A (2022) An evaluation of green road incentive procurement in road construction projects by using the AHP. International Journal of Construction Management, 22(03), 501-13.

Minami, K (2004) Whole life appraisal of the repair and improvement work costs of Post Office buildings in Japan. Construction Management and Economics, 22(03), 311-8.

Mitropoulos, P and Tajima, V (2022) Constructability opportunities in the engineering design of marine pier structures: A case study. International Journal of Construction Management, 22(03), 366-78.

Moshood, T D, Rotimi, F E and Rotimi, J O B (2022) An integrated paradigm for managing efficient knowledge transfer: Towards a more comprehensive philosophy of transferring knowledge in the construction industry. Construction Economics and Building, 22(03), 65-98.

Mustaffa, N K, Isa, C M M, Ekundayo, D and Joseph, V R A (2022) Barriers and strategies for improving carbon emissions management approaches in Malaysian construction. Construction Economics and Building, 22(03), 99-123.

Nguyen, D C, Nguyen, T Q, Jin, R, Jeon, C H and Shim, C S (2022) BIM-based mixed-reality application for bridge inspection and maintenance. Construction Innovation, 22(03), 487-503.

Osuizugbo, I C, Okolie, K C and Oshodi, O S (2024) Factors supporting the implementation of buildability assessment as a tool for buildability improvement. Journal of Engineering, Design and Technology, 22(03), 879-900.

Oyegoke, A S and Al Kiyumi, N (2017) The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman. Journal of Financial Management of Property and Construction, 22(03), 286-302.

Quaigrain, R A, Owusu-Manu, D G, Edwards, D J, Hammond, M, Hammond, M and Martek, I (2024) Occupational health and safety orientation in the oil and gas industry of Ghana: analysis of knowledge and attitudinal influences on compliance. Journal of Engineering, Design and Technology, 22(03), 795-812.

Reyes Veras, P, Renukappa, S and Suresh, S (2022) Awareness of Big Data concept in the Dominican Republic construction industry: an empirical study. Construction Innovation, 22(03), 465-86.

S, E K and M.K, P (2024) Adaptive deep learning for deep COVID-19 diagnosis. Journal of Engineering, Design and Technology, 22(03), 763-94.

Sadeghineko, F and Kumar, B (2022) Application of semantic Web ontologies for the improvement of information exchange in existing buildings. Construction Innovation, 22(03), 444-64.

Sandanayake, M, Zhang, G and Setunge, S (2022) Impediments affecting a comprehensive emission assessment at the construction stage of a building. International Journal of Construction Management, 22(03), 453-63.

Shayan, S, Pyung Kim, K and Tam, V W Y (2022) Critical success factor analysis for effective risk management at the execution stage of a construction project. International Journal of Construction Management, 22(03), 379-86.

Sobuz, M H R, Meraz, M M, Saha, A, Akid, A S M, Hasan, N M S, Rahman, M and Safayet, M A (2024) Performance assessment of various seismic resistant systems for a multistory structure in different seismic zones of Bangladesh. Journal of Engineering, Design and Technology, 22(03), 718-38.

Sulaimon, I A, Alaka, H, Olu-Ajayi, R, Ahmad, M, Ajayi, S and Hye, A (2024) Effect of traffic data set on various machine-learning algorithms when forecasting air quality. Journal of Engineering, Design and Technology, 22(03), 1030-56.

Talebi, S, Wu, S, Al-Adhami, M, Shelbourn, M and Serugga, J (2022) The development of a digitally enhanced visual inspection framework for masonry bridges in the UK. Construction Innovation, 22(03), 624-46.

Tang, S L, Aoieong, R T and Ahmed, S M (2004) The use of process cost model (PCM) for measuring quality costs of construction projects: model testing. Construction Management and Economics, 22(03), 263-75.

Taniguchi, K, Kubota, S and Yasumuro, Y (2022) Quantitative visualization of physical barriers for vulnerable pedestrians based on photogrammetry. Construction Innovation, 22(03), 604-23.

Thakare, P and V, R S (2024) Advanced pest detection strategy using hybrid optimization tuned deep convolutional neural network. Journal of Engineering, Design and Technology, 22(03), 645-78.

Wang, S Q, Dulaimi, M F and Aguria, M Y (2004) Risk management framework for construction projects in developing countries. Construction Management and Economics, 22(03), 237-52.

Wild, A (2004) Re-interpreting the Building Industry Communications Research Project. Construction Management and Economics, 22(03), 303-10.

Yap, J B H and Shavarebi, K (2022) Enhancing project delivery performances in construction through experiential learning and personal constructs: Competency development. International Journal of Construction Management, 22(03), 436-52.

Zamani, S H, Rahman, R A, Fauzi, M A and Mohamed Yusof, L (2024) Government pandemic response strategies for AEC enterprises: lessons from COVID-19. Journal of Engineering, Design and Technology, 22(03), 690-717.

Zhao, X, Hwang, B-G and Low, S P (2015) Enterprise risk management in international construction firms: Drivers and hindrances. Engineering, Construction and Architectural Management, 22(03), 347-66.

Zulu, E, Zulu, S L, Chabala, M, Kavishe, N, Chifunda, C and Musonda, I (2024) Infrastructure design stage considerations for environmental sustainability in Zambia. Journal of Engineering, Design and Technology, 22(03), 836-53.