Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 479 results ...

Şentop Dümen, A and Tamer Bayazıt, N (2020) Enforcement of acoustic performance assessment in residential buildings and occupant satisfaction. Building Research & Information, 48(08), 866–85.

Abbasian-Hosseini, S A, Hsiang, S M, Leming, M L and Liu, M (2014) From Social Network to Data Envelopment Analysis: Identifying Benchmarks at the Site Management Level. Journal of Construction Engineering and Management, 140(08).

Abdirad, H and Dossick, C S (2019) Normative and descriptive models for COBie implementation: discrepancies and limitations. Engineering, Construction and Architectural Management, 26(08), 1820–36.

Abdul-Aziz, A-R (2001) Foreign workers and labour segmentation in Malaysia's construction industry. Construction Management and Economics, 19(08), 789-98.

Abu Dabous, S and Alkass, S (2008) Decision support method for multi-criteria selection of bridge rehabilitation strategy. Construction Management and Economics, 26(08), 883–93.

Abuimara, T, O’Brien, W, Gunay, B and Carrizo, J S (2019) Towards occupant-centric simulation-aided building design: a case study. Building Research & Information, 47(08), 866–82.

Acar, E and Göç, Y (2011) Prediction of risk perception by owners’ psychological traits in small building contractors. Construction Management and Economics, 29(08), 841–52.

Ade, R and Rehm, M (2021) RETRACTED ARTICLE: A summertime thermal analysis of certified green apartments for older people. Building Research & Information, 49(08), 949–60.

Agapiou, A (2002) Perceptions of gender roles and attitudes toward work among male and female operatives in the Scottish construction industry. Construction Management and Economics, 20(08), 697-705.

Ahadzie, D K, Proverbs, D G and Olomolaiye, P O (2008) Model for Predicting the Performance of Project Managers at the Construction Phase of Mass House Building Projects. Journal of Construction Engineering and Management, 134(08), 618–29.

Ahn, S, Lee, S and Steel, R P (2013) Effects of Workers’ Social Learning: Focusing on Absence Behavior. Journal of Construction Engineering and Management, 139(08), 1015–25.

Alananga, S, Lucian, C and Kusiluka, M M (2015) Significant cost-push factors in owner-built incremental housing construction in Tanzania. Construction Management and Economics, 33(08), 671-88.

AlChaer, E and Issa, C A (2020) Engineering Productivity Measurement: A Novel Approach. Journal of Construction Engineering and Management, 146(08).

Allison, L and Kaminsky, J (2017) Safety Communication Networks: Females in Small Work Crews. Journal of Construction Engineering and Management, 143(08).

Almarri, K, Alzahrani, S and Boussabaine, H (2019) An evaluation of the impact of risk cost on risk allocation in public private partnership projects. Engineering, Construction and Architectural Management, 26(08), 1696–711.

Almeida, L, Tam, V W, Le, K N and She, Y (2020) Effects of occupant behaviour on energy performance in buildings: a green and non-green building comparison. Engineering, Construction and Architectural Management, 27(08), 1939–62.

Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(08), 715–25.

Anastasopoulos, P C, Labi, S, Bhargava, A, Bordat, C and Mannering, F L (2010) Frequency of Change Orders in Highway Construction Using Alternate Count-Data Modeling Methods. Journal of Construction Engineering and Management, 136(08), 886–93.

Andersen, L P, Karlsen, I L, Kines, P, Joensson, T and Nielsen, K J (2015) Social identity in the construction industry: implications for safety perception and behaviour. Construction Management and Economics, 33(08), 640-52.

Anson, M, Ying, K T and Siu, M F (2019) Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. Engineering, Construction and Architectural Management, 26(08), 1672–95.

Antwi-Afari, M F, Li, H, Wong, J K, Oladinrin, O T, Ge, J X, Seo, J and Wong, A Y L (2019) Sensing and warning-based technology applications to improve occupational health and safety in the construction industry. Engineering, Construction and Architectural Management, 26(08), 1534–52.

Arabi, S, Eshtehardian, E and Shafiei, I (2022) Using Bayesian Networks for Selecting Risk-Response Strategies in Construction Projects. Journal of Construction Engineering and Management, 148(08).

Arambula, E and Gharaibeh, N (2014) Methods for Accumulating Construction and Material Quality Test Results and Their Effect on Acceptance Decisions. Journal of Construction Engineering and Management, 140(08).

Arditi, D and Chotibhongs, R (2009) Detection and prevention of unbalanced bids. Construction Management and Economics, 27(08), 721–32.

Arditi, D and Chotibhongs, R (2005) Issues in Subcontracting Practice. Journal of Construction Engineering and Management, 131(08), 866–76.

Assad, A, Moselhi, O and Zayed, T (2021) Resilience-Driven Sustainability-Based Rehabilitation Planning for Water Distribution Networks. Journal of Construction Engineering and Management, 147(08).

Au-Yong, C P, Chua, S J L, Ali, A S and Tucker, M (2019) Optimising maintenance cost by prioritising maintenance of facilities services in residential buildings. Engineering, Construction and Architectural Management, 26(08), 1593–607.

Aye, L, Bamford, N, Charters, B and Robinson, J (2000) Environmentally sustainable development: a life-cycle costing approach for a commercial office building in Melbourne, Australia. Construction Management and Economics, 18(08), 927-34.

Bademosi, F and Issa, R R A (2021) Factors Influencing Adoption and Integration of Construction Robotics and Automation Technology in the US. Journal of Construction Engineering and Management, 147(08).

Ballesteros-Pérez, P, Skitmore, M, Cerezo-Narváez, A, González-Cruz, M C, Pastor-Fernández, A and Otero-Mateo, M (2021) Standard Deviation of Bids for Construction Contract Auctions. Journal of Construction Engineering and Management, 147(08).

Basurto, C, Kämpf, J H and Scartezzini, J-L (2017) Multi-criteria analysis for the integrated performance assessment of complex fenestration systems. Building Research & Information, 45(08), 926-42.

Bayraktar, M E, Arif, F, Ponder, D, Prozzi, J and Mahmoud, N V (2016) Opportunities for Value Extraction Projects in Highway Rights-of-Way and Development of Feasibility Assessment Tool. Journal of Construction Engineering and Management, 142(08).

Behm, M (2012) Safe Design Suggestions for Vegetated Roofs. Journal of Construction Engineering and Management, 138(08), 999–1003.

Benjaoran, V and Peansupap, V (2020) Grid-based construction site layout planning with Particle Swarm Optimisation and Travel Path Distance. Construction Management and Economics, 38(08), 673–88.

Bergström, M and Stehn, L (2005) Benefits and disadvantages of ERP in industrialised timber frame housing in Sweden. Construction Management and Economics, 23(08), 831-8.

Bienvenido-Huertas, D, Rubio-Bellido, C, Sánchez-García, D and Moyano, J (2019) Internal surface condensation risk in façades of Spanish social dwellings. Building Research & Information, 47(08), 928–47.

  • Type: Journal Article
  • Keywords: Climate change; climate zones; internal surface condensation; multi-layer perceptron; simulation;
  • ISBN/ISSN: 0961-3218
  • URL: https://doi.org/10.1080/09613218.2019.1612729
  • Abstract:
    The poor maintenance of social dwellings causes the possible building deficiencies to be significantly increased, especially when most of these dwellings have been built before any thermal standard and without considering the effect of climate change. Façades are one of the building elements which are most degraded by the contact with the exterior, and surface condensation is the most common cause. This study applies the calculation of surface condensation from ISO 13788 to a representative case of social dwelling in Spain for all climate zones, both in the current and 2050 scenarios. Risks of corrosion, mould formation, and surface condensation were studied in nine different points of the façade, which were validated by in-situ measurements. The results determined that there was a greater risk of condensation or mould depending on the climate zone, and thermal resistance significantly influenced data variation in future scenarios. The results also showed that an adequate ventilation generally decreased risks, removing the risk of mould and surface condensation by 2050. To predict the results obtained, a model based on artificial neural networks was generated, and it could also be used to estimate risks in the future.

Bogus, S M, Molenaar, K R and Diekmann, J E (2006) Strategies for overlapping dependent design activities. Construction Management and Economics, 24(08), 829-37.

Bonham, D R, Goodrum, P M, Littlejohn, R and Albattah, M A (2017) Application of Data Mining Techniques to Quantify the Relative Influence of Design and Installation Characteristics on Labor Productivity. Journal of Construction Engineering and Management, 143(08).

Bonnal, P, Gourc, D, Hameri, A-p and Lacoste, G (2005) A linear-discrete scheduling model for the resource-constrained project scheduling problem. Construction Management and Economics, 23(08), 797-814.

Boonstra, C and Knapen, M (2000) Knowledge infrastructure for sustainable building in The Netherlands. Construction Management and Economics, 18(08), 885-91.

Borge, L and Hopland, A O (2023) Fiscal and political determinants of local government maintenance. Building Research & Information, 51(08), 937–48.

Bortolini, R and Forcada, N (2020) A probabilistic performance evaluation for buildings and constructed assets. Building Research & Information, 48(08), 838–55.

Bowen, P, Dorrington, R, Distiller, G, Lake, H and Besesar, S (2008) HIV/AIDS in the South African construction industry: an empirical study. Construction Management and Economics, 26(08), 827–39.

Bröchner, J, Josephson, P-e and Alte, J (2005) Identifying management research priorities. Construction Management and Economics, 23(08), 793-6.

Bridge, A J and Tisdell, C (2004) The determinants of the vertical boundaries of the construction firm. Construction Management and Economics, 22(08), 807-25.

Brown, N, Malmqvist, T and Wintzell, H (2016) Owner organizations' value-creation strategies through environmental certification of buildings. Building Research & Information, 44(08), 863-74.

BuHamdan, S, Alwisy, A, Bouferguene, A and Al-Hussein, M (2019) Novel Approach to Overcoming Discontinuity in Knowledge: Application in Value-Adding Frameworks in Construction Industry. Journal of Construction Engineering and Management, 145(08).

Cai, H, Kuczek, T, Dunston, P S and Li, S (2017) Correlating Intelligent Compaction Data to In Situ Soil Compaction Quality Measurements. Journal of Construction Engineering and Management, 143(08).

Cai, S, Ma, Z, Skibniewski, M J, Bao, S and Wang, H (2020) Construction Automation and Robotics for High-Rise Buildings: Development Priorities and Key Challenges. Journal of Construction Engineering and Management, 146(08).

Cameron, I and Duff, R (2007) Use of performance measurement and goal setting to improve construction managers' focus on health and safety. Construction Management and Economics, 25(08), 869–81.

Carpino, C, Loukou, E, Heiselberg, P and Arcuri, N (2020) Energy performance gap of a nearly Zero Energy Building (nZEB) in Denmark: the influence of occupancy modelling. Building Research & Information, 48(08), 899–921.

Cattell, D W, Bowen, P A and Kaka, A P (2007) Review of Unbalanced Bidding Models in Construction. Journal of Construction Engineering and Management, 133(08), 562–73.

Caven, V and Astor, E N (2013) The potential for gender equality in architecture: an Anglo-Spanish comparison. Construction Management and Economics, 31(08), 874-82.

Chan, A P C and Owusu, E K (2017) Corruption Forms in the Construction Industry: Literature Review. Journal of Construction Engineering and Management, 143(08).

Chan, P W (2013) Queer eye on a ‘straight’ life: deconstructing masculinities in construction. Construction Management and Economics, 31(08), 816-31.

Chand, A M and Loosemore, M (2016) Hospital learning from extreme weather events: Using causal loop diagrams. Building Research & Information, 44(08), 875-88.

Chang, C-Y and Ive, G (2007) Reversal of bargaining power in construction projects: meaning, existence and implications. Construction Management and Economics, 25(08), 845–55.

Chang, C, Pan, W and Howard, R (2017) Impact of Building Information Modeling Implementation on the Acceptance of Integrated Delivery Systems: Structural Equation Modeling Analysis. Journal of Construction Engineering and Management, 143(08).

Chang, T, Chi, S and Im, S (2022) Understanding User Experience and Satisfaction with Urban Infrastructure through Text Mining of Civil Complaint Data. Journal of Construction Engineering and Management, 148(08).

Chao, L-C and Liou, C-N (2007) Risk-minimizing approach to bid-cutting limit determination. Construction Management and Economics, 25(08), 835–43.

Charkhakan, M H and Heravi, G (2019) Evaluating the preventability of conflicts arising from change occurrence in construction projects. Engineering, Construction and Architectural Management, 26(08), 1777–800.

Chatzipoulka, C and Nikolopoulou, M (2018) Urban geometry, SVF and insolation of open spaces: London and Paris. Building Research & Information, 46(08), 881–98.

Chau, C K, Lee, W L, Yik, F W H and Burnett, J (2000) Towards a successful voluntary building environmental assessment scheme. Construction Management and Economics, 18(08), 959-68.

Chen, J-H, Yang, L-R, Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(08), 805–14.

Chen, J, Taylor, J E and Comu, S (2017) Assessing Task Mental Workload in Construction Projects: A Novel Electroencephalography Approach. Journal of Construction Engineering and Management, 143(08).

Chen, L, Manley, K, Lewis, J, Helfer, F and Widen, K (2018) Procurement and Governance Choices for Collaborative Infrastructure Projects. Journal of Construction Engineering and Management, 144(08).

Chen, X B and Kim, T W (2017) Automated Mapping of User Activities onto Flexible Space in Space-Use Analysis. Journal of Construction Engineering and Management, 143(08).

Chen, Y, Chen, S, Hu, C, Jin, L and Zheng, X (2020) Novel Probabilistic Cost Estimation Model Integrating Risk Allocation and Claim in Hydropower Project. Journal of Construction Engineering and Management, 146(08).

Chen, Y, Chen, Y, Smyth, H and Fu, Y (2021) Enforcement against contract violation in Chinese construction projects: impacts of trust and perceived intentionality. Construction Management and Economics, 39(08), 687–703.

Chen, Y, McCabe, B and Hyatt, D (2017) Relationship between Individual Resilience, Interpersonal Conflicts at Work, and Safety Outcomes of Construction Workers. Journal of Construction Engineering and Management, 143(08).

Chen, Y, Wang, W, Zhang, S and You, J (2018) Understanding the multiple functions of construction contracts: the anatomy of FIDIC model contracts. Construction Management and Economics, 36(08), 472–85.

Cheng, E W L and Li, H (2006) Job Performance Evaluation for Construction Companies: An Analytic Network Process Approach. Journal of Construction Engineering and Management, 132(08), 827–35.

Cheng, E W, Li, H and Fox, P (2007) Job Performance Dimensions for Improving Final Project Outcomes. Journal of Construction Engineering and Management, 133(08), 592–9.

Cheung, S O, Yiu, T W and Lam, M C (2013) Interweaving Trust and Communication with Project Performance. Journal of Construction Engineering and Management, 139(08), 941–50.

Cheung, S O, Yiu, T W and Yeung, S F (2006) A Study of Styles and Outcomes in Construction Dispute Negotiation. Journal of Construction Engineering and Management, 132(08), 805–14.

Chih, Y, Kiazad, K, Cheng, D, Lajom, J A L and Restubog, S L D (2017) Feeling Positive and Productive: Role of Supervisor–Worker Relationship in Predicting Construction Workers’ Performance in the Philippines. Journal of Construction Engineering and Management, 143(08).

Cho, C, Kim, K, Park, J and Cho, Y K (2018) Data-Driven Monitoring System for Preventing the Collapse of Scaffolding Structures. Journal of Construction Engineering and Management, 144(08).

Choi, K, Lee, E-B, Ibbs, C W and Kim, Y W (2009) Multifaceted public outreach and cost–benefit analysis for its effectiveness validation. Construction Management and Economics, 27(08), 771–82.

Choi, Y, Kim, D, Kim, S, Nam, M S and Kim, T (2013) Implementation of Noise-Free and Vibration-Free PHC Screw Piles on the Basis of Full-Scale Tests. Journal of Construction Engineering and Management, 139(08), 960–7.

Choudhury, T (2013) Experiences of women as workers: a study of construction workers in Bangladesh. Construction Management and Economics, 31(08), 883-98.

Chung, T H, Mohamed, Y and AbouRizk, S (2006) Bayesian Updating Application into Simulation in the North Edmonton Sanitary Trunk Tunnel Project. Journal of Construction Engineering and Management, 132(08), 882–94.

Clement, D, Aliabadi, A A, Mackey, J, Thé, J and Gharabaghi, B (2021) Dust Emissions Management Model for Construction Sites. Journal of Construction Engineering and Management, 147(08).

Cole, R J (2000) Building environmental assessment methods: assessing construction practices. Construction Management and Economics, 18(08), 949-57.

Cuervo, J C and Low, S P (2004) Global performance measures for transnational construction corporations. Construction Management and Economics, 22(08), 851-60.

da Rocha, C G, Kemmer, S L and Meneses, L (2016) Managing Customization Strategies to Reduce Workflow Variations in House Building Projects. Journal of Construction Engineering and Management, 142(08).

Dainty, A R J, Cheng, M-I and Moore, D R (2004) A competency-based performance model for construction project managers. Construction Management and Economics, 22(08), 877-86.

Dainty, A R, Briscoe, G H and Millett, S J (2001) Subcontractor perspectives on supply chain alliances. Construction Management and Economics, 19(08), 841-8.

Davis, P R, Jefferies, M and Ke, Y (2017) Psychological Contracts: Framework for Relationships in Construction Procurement. Journal of Construction Engineering and Management, 143(08).

de la Cruz, M P, del Caño, A and de la Cruz, E (2006) Downside Risks in Construction Projects Developed by the Civil Service: The Case of Spain. Journal of Construction Engineering and Management, 132(08), 844–52.

de Lima, R X, Júnior, E F N, Prata, B d A and Weissmann, J (2013) Distribution of Materials in Road Earthmoving and Paving: Mathematical Programming Approach. Journal of Construction Engineering and Management, 139(08), 1046–54.

De Marco, A and Mangano, G (2013) Risk and Value in Privately Financed Health Care Projects. Journal of Construction Engineering and Management, 139(08), 918–26.

Dewlaney, K S, Hallowell, M R and Fortunato, B R (2012) Safety Risk Quantification for High Performance Sustainable Building Construction. Journal of Construction Engineering and Management, 138(08), 964–71.

Dhanshyam, M and Srivastava, S K (2021) Governance structures for public infrastructure projects: Public–private management regimes, contractual forms and innovation. Construction Management and Economics, 39(08), 652–68.

Diab, M F, Varma, A and Panthi, K (2017) Modeling the Construction Risk Ratings to Estimate the Contingency in Highway Projects. Journal of Construction Engineering and Management, 143(08).

Dias Barkokebas, R, Al-Hussein, M and Li, X (2022) VR–MOCAP-Enabled Ergonomic Risk Assessment of Workstation Prototypes in Offsite Construction. Journal of Construction Engineering and Management, 148(08).

Doloi, H (2008) Application of AHP in improving construction productivity from a management perspective. Construction Management and Economics, 26(08), 841–54.

Dorée, A G and Holmen, E (2004) Achieving the unlikely: innovating in the loosely coupled construction system. Construction Management and Economics, 22(08), 827-38.

Duffy, G A, Oberlender, G D and Seok Jeong, D H (2011) Linear Scheduling Model with Varying Production Rates. Journal of Construction Engineering and Management, 137(08), 574–82.

Duncheva, T and Bradley, F F (2019) Multifaceted Productivity Comparison of Off-Site Timber Manufacturing Strategies in Mainland Europe and the United Kingdom. Journal of Construction Engineering and Management, 145(08).

Duodu, B and Rowlinson, S (2021) Opening Up the Innovation Process in Construction Firms: External Knowledge Sources and Dual Innovation. Journal of Construction Engineering and Management, 147(08).

Duong, T B A, Pham, T, Truong, Q H, Nguyen, K, Pham, C H, Hoang, T and Pham, T H (2023) Risk in sustainable construction supply chains: construct development and measurement validation. Construction Management and Economics, 41(08), 634–50.

Dutta, A, Breloff, S P, Dai, F, Sinsel, E W, Warren, C M, Carey, R E and Wu, J Z (2021) Application of Data Fusion via Canonical Polyadic Decomposition in Risk Assessment of Musculoskeletal Disorders in Construction: Procedure and Stability Evaluation. Journal of Construction Engineering and Management, 147(08).

Easa, S M and Hossain, K M A (2008) New Mathematical Optimization Model for Construction Site Layout. Journal of Construction Engineering and Management, 134(08), 653–62.

Eiris, R, Jain, E, Gheisari, M and Wehle, A (2021) Online Hazard Recognition Training: Comparative Case Study of Static Images, Cinemagraphs, and Videos. Journal of Construction Engineering and Management, 147(08).

Eisenstein, W, Fuertes, G, Kaam, S, Seigel, K, Arens, E and Mozingo, L (2017) Climate co-benefits of green building standards: Water, waste and transportation. Building Research & Information, 45(08), 828-44.

El Asmar, M, Lotfallah, W, Whited, G and Hanna, A S (2010) Quantitative Methods for Design-Build Team Selection. Journal of Construction Engineering and Management, 136(08), 904–12.

El-Gohary, K M, Aziz, R F and Abdel-Khalek, H A (2017) Engineering Approach Using ANN to Improve and Predict Construction Labor Productivity under Different Influences. Journal of Construction Engineering and Management, 143(08).

Elbarkouky, M M G and Robinson Fayek, A (2011) Fuzzy Preference Relations Consensus Approach to Reduce Conflicts on Shared Responsibilities in the Owner Managing Contractor Delivery System. Journal of Construction Engineering and Management, 137(08), 609–18.

Elghamrawy, T, El-Rayes, K, Liu, L and Odeh, I (2012) Performance of Temporary Rumble Strips at the Edge of Highway Construction Zones. Journal of Construction Engineering and Management, 138(08), 923–30.

Elyamany, A, Basha, I and Zayed, T (2007) Performance Evaluating Model for Construction Companies: Egyptian Case Study. Journal of Construction Engineering and Management, 133(08), 574–81.

Eriksson, P E and Ossi (2007) Modelling procurement effects on cooperation. Construction Management and Economics, 25(08), 893–901.

Esmaeili, B and Hallowell, M R (2012) Diffusion of Safety Innovations in the Construction Industry. Journal of Construction Engineering and Management, 138(08), 955–63.

Esmaeili, B, Hallowell, M R and Rajagopalan, B (2015) Attribute-Based Safety Risk Assessment. I: Analysis at the Fundamental Level. Journal of Construction Engineering and Management, 141(08).

Esmaeili, B, Hallowell, M R and Rajagopalan, B (2015) Attribute-Based Safety Risk Assessment. II: Predicting Safety Outcomes Using Generalized Linear Models. Journal of Construction Engineering and Management, 141(08).

Essah, E A, Russell, S J, Waring, S D, Ferguson, J, Williams, C, Walsh, K, Dyer, S and Raynor, R (2020) Method for evaluating the snagging propensity of roofing membranes in buildings by roosting bats. Building Research & Information, 48(08), 886–98.

Eyssautier-Chuine, S, Mouhoubi, K, Reffuveille, F and Bodnar, J (2020) Thermographic imaging for early detection of biocolonization on buildings. Building Research & Information, 48(08), 856–65.

Ezcan, V, Goulding, J S and Arif, M (2020) Redefining ICT embeddedness in the construction industry: maximizing technology diffusion capabilities to support agility. Building Research & Information, 48(08), 922–44.

Ezzeddine, A, Shehab, L, Lucko, G and Hamzeh, F (2022) Forecasting Construction Project Performance with Momentum Using Singularity Functions in LPS. Journal of Construction Engineering and Management, 148(08).

Faghih, S A M and Kashani, H (2018) Forecasting Construction Material Prices Using Vector Error Correction Model. Journal of Construction Engineering and Management, 144(08).

Fan, S C, Shen, Q P and Luo, X (2010) Group decision support systems in value management. Construction Management and Economics, 28(08), 38.

Faust, K M and Kaminsky, J A (2017) Building Water and Wastewater System Resilience to Disaster Migration: Utility Perspectives. Journal of Construction Engineering and Management, 143(08).

Fayek, A R and Oduba, A (2005) Predicting Industrial Construction Labor Productivity Using Fuzzy Expert Systems. Journal of Construction Engineering and Management, 131(08), 938–41.

Fellows, R and Liu, A M M (2012) Managing organizational interfaces in engineering construction projects: addressing fragmentation and boundary issues across multiple interfaces. Construction Management and Economics, 30(08), 653-71.

Fellows, R F, Liu, A and Fong, C M (2003) Leadership style and power relations in quantity surveying in Hong Kong. Construction Management and Economics, 21(08), 809-18.

Feng, K, Wang, S, Lu, W, Liu, C and Wang, Y (2022) Planning Construction Projects in Deep Uncertainty: A Data-Driven Uncertainty Analysis Approach. Journal of Construction Engineering and Management, 148(08).

Fennell, P, Ruyssevelt, P and Smith, A Z P (2016) Financial viability of school retrofit projects for clients and ESCOs. Building Research & Information, 44(08), 889-11.

Fisher, D J, Schluter, L and Toleti, P K (2005) Project Management Education and Training Process for Career Development. Journal of Construction Engineering and Management, 131(08), 903–10.

Forcada, N, Gangolells, M, Casals, M and Macarulla, M (2017) Factors Affecting Rework Costs in Construction. Journal of Construction Engineering and Management, 143(08).

Fox, S, Marsh, L and Cockerham, G (2002) Constructability rules: guidelines for successful application to bespoke buildings. Construction Management and Economics, 20(08), 689-96.

Fraser, C and Zarkada-Frazer, A (2001) The philosophy, structure and objectives of research and development in Japan. Construction Management and Economics, 19(08), 831-40.

Fu, W K, Drew, D S and Lo, H P (2002) The effect of experience on contractors' competitiveness in recurrent bidding. Construction Management and Economics, 20(08), 655-66.

Fu, Y, Chen, Y, Zhang, S and Wang, W (2015) Promoting cooperation in construction projects: an integrated approach of contractual incentive and trust. Construction Management and Economics, 33(08), 653-70.

Futcher, J, Mills, G and Emmanuel, R (2018) Interdependent energy relationships between buildings at the street scale. Building Research & Information, 46(08), 829–44.

Gangwar, M and Goodrum, P M (2005) The effect of time on safety incentive programs in the US construction industry. Construction Management and Economics, 23(08), 851-9.

Gao, J, Ren, H, Ma, X, Cai, W and Shi, Q (2019) A total energy efficiency evaluation framework based on embodied energy for the construction industry and the spatio-temporal evolution analysis. Engineering, Construction and Architectural Management, 26(08), 1652–71.

Garretón, J Y, Rodriguez, R and Pattini, A (2016) Effects of perceived indoor temperature on daylight glare perception. Building Research & Information, 44(08), 907-19.

Garrett, J W and Teizer, J (2009) Human Factors Analysis Classification System Relating to Human Error Awareness Taxonomy in Construction Safety. Journal of Construction Engineering and Management, 135(08), 754–63.

Geekiyanage, D and Ramachandra, T (2021) Running costs indices for commercial buildings using the hedonic price imputation approach: a case of Sri Lanka. Construction Management and Economics, 39(08), 704–21.

Genc, O (2021) SymbioConstruction: A Bibliography-Driven Dynamic Construction Industry Symbiosis Database. Journal of Construction Engineering and Management, 147(08).

George, M and Loosemore, M (2019) Site operatives’ attitudes towards traditional masculinity ideology in the Australian construction industry. Construction Management and Economics, 37(08), 419–32.

Ghanbaripour, A N, Langston, C and Yousefi, A (2017) Implementation of 3D Integration Model for Project Delivery Success: Case Study. Journal of Construction Engineering and Management, 143(08).

Gharaibeh, H M (2013) Managing the Cost of Power Transmission Projects: Lessons Learned. Journal of Construction Engineering and Management, 139(08), 1063–7.

Gillott, C, Davison, B and Densley Tingley, D (2022) Drivers, barriers and enablers: construction sector views on vertical extensions. Building Research & Information, 50(08), 909–23.

Giritli, H and Civan, I (2008) Personality Study of Construction Professionals in the Turkish Construction Industry. Journal of Construction Engineering and Management, 134(08), 630–4.

Girmscheid, G (2009) NPV Model for Evaluating the Economic Efficiency of Municipal Street Maintenance by Private Providers. Journal of Construction Engineering and Management, 135(08), 701–9.

Godoy-Shimizu, D, Steadman, P, Hamilton, I, Donn, M, Evans, S, Moreno, G and Shayesteh, H (2018) Energy use and height in office buildings. Building Research & Information, 46(08), 845–63.

Golabchi, A, Han, S, Seo, J, Han, S, Lee, S and Al-Hussein, M (2015) An Automated Biomechanical Simulation Approach to Ergonomic Job Analysis for Workplace Design. Journal of Construction Engineering and Management, 141(08).

Gomes Araújo, L and Lucko, G (2022) Best Practices for Case Studies in Construction Engineering and Management Research. Journal of Construction Engineering and Management, 148(08).

González-Prieto, D, Fernández-Nava, Y, Marañón, E and Prieto, M M (2021) Environmental life cycle assessment based on the retrofitting of a twentieth-century heritage building in Spain, with electricity decarbonization scenarios. Building Research & Information, 49(08), 859–77.

González-Jorge, H, Martínez Sánchez, J, Díaz-Vilariño, L, Puente, I and Arias, P (2016) Automatic Registration of Mobile LiDAR Data Using High-Reflectivity Traffic Signs. Journal of Construction Engineering and Management, 142(08).

Graham, P (2000) Building education for the next industrial revolution: teaching and learning environmental literacy for the building professions. Construction Management and Economics, 18(08), 917-25.

Greenwood, D and Gledson, B J (2012) The efficient scheduling of resources in engineering construction projects: reflections on a case study from Iran. Construction Management and Economics, 30(08), 687-95.

Griffith, A (2007) Key considerations for delivering best value in the small building works portfolio of large client organizations. Construction Management and Economics, 25(08), 903–9.

Griffith, A (2002) Key considerations for developing corporate and operational approaches for managing the small building works portfolio of large client organizations. Construction Management and Economics, 20(08), 679-87.

Grosskopf, K R and Kibert, C J (2006) Economic incentive framework for sustainable energy use in US residential construction. Construction Management and Economics, 24(08), 839-46.

Gunhan, S and Arditi, D (2005) International Expansion Decision for Construction Companies. Journal of Construction Engineering and Management, 131(08), 928–37.

Habibi, M and Kermanshachi, S (2018) Phase-based analysis of key cost and schedule performance causes and preventive strategies. Engineering, Construction and Architectural Management, 25(08), 1009–33.

Hajifathalian, K, Howell, G, Wambeke, B W, Hsiang, S M and Liu, M (2016) “Oops” Simulation: Cost–Benefits Trade-Off Analysis of Reliable Planning for Construction Activities. Journal of Construction Engineering and Management, 142(08).

Hallowell, M R (2011) Risk-Based Framework for Safety Investment in Construction Organizations. Journal of Construction Engineering and Management, 137(08), 592–9.

Hammad, A W A (2020) A multi-objective construction site layout planning problem solved through integration of location and traffic assignment models. Construction Management and Economics, 38(08), 756–72.

Han, S H and Diekmann, J E (2001) Making a risk-based decision for overseas construction projects. Construction Management and Economics, 19(08), 765-76.

Han, Y, Li, Y, Rao, P and Taylor, J E (2021) Global Collaborative Network of Skyscraper Projects from 1990 to 2010: Temporal Evolution and Spatial Characteristics. Journal of Construction Engineering and Management, 147(08).

Han, Y, Yin, Z, Zhang, J, Jin, R and Yang, T (2020) Eye-Tracking Experimental Study Investigating the Influence Factors of Construction Safety Hazard Recognition. Journal of Construction Engineering and Management, 146(08).

Hanna, A S, Ibrahim, M W, Lotfallah, W, Iskandar, K A and Russell, J S (2016) Modeling Project Manager Competency: An Integrated Mathematical Approach. Journal of Construction Engineering and Management, 142(08).

Hanna, A S, Lotfallah, W, Aoun, D G and Asmar, M E (2014) Mathematical Formulation of the Project Quarterback Rating: New Framework to Assess Construction Project Performance. Journal of Construction Engineering and Management, 140(08).

Haponava, T and Al-Jibouri, S (2010) Influence of process performance during the construction stage on achieving end-project goals. Construction Management and Economics, 28(08), 69.

Hashemi, H, Mousavi, S M and Mojtahedi, S M H (2011) Bootstrap Technique for Risk Analysis with Interval Numbers in Bridge Construction Projects. Journal of Construction Engineering and Management, 137(08), 600–8.

He, Q, Wang, T, Chan, A P, Li, H and Chen, Y (2019) Identifying the gaps in project success research. Engineering, Construction and Architectural Management, 26(08), 1553–73.

Heaton, R, Martin, H, Chadee, A, Milling, A, Dunne, S and Borthwick, F (2022) The Construction Materials Conundrum: Practical Solutions to Address Integrated Supply Chain Complexities. Journal of Construction Engineering and Management, 148(08).

Hegazy, T and Menesi, W (2008) Delay Analysis under Multiple Baseline Updates. Journal of Construction Engineering and Management, 134(08), 575–82.

Henjewele, C, Sun, M and Fewings, P (2011) Critical parameters influencing value for money variations in PFI projects in the healthcare and transport sectors. Construction Management and Economics, 29(08), 825–39.

Hessami, A R, Faghihi, V, Kim, A and Ford, D N (2020) Evaluating planning strategies for prioritizing projects in sustainability improvement programs. Construction Management and Economics, 38(08), 726–38.

Hilali, A, Charoenngam, C and Barman, A (2019) Barriers in contractual scope management of international development projects in Afghanistan. Engineering, Construction and Architectural Management, 26(08), 1574–92.

Hildreth, J, Vorster, M and Martinez, J (2005) Reduction of Short-Interval GPS Data for Construction Operations Analysis. Journal of Construction Engineering and Management, 131(08), 920–7.

Hopkin, T, Lu, S, Sexton, M and Rogers, P (2019) Learning from defects in the UK housing sector using action research. Engineering, Construction and Architectural Management, 26(08), 1608–24.

Horta, I M, Camanho, A S and Lima, A F (2013) Design of Performance Assessment System for Selection of Contractors in Construction Industry E-Marketplaces. Journal of Construction Engineering and Management, 139(08), 910–7.

Hosseini, M R, Maghrebi, M, Akbarnezhad, A, Martek, I and Arashpour, M (2018) Analysis of Citation Networks in Building Information Modeling Research. Journal of Construction Engineering and Management, 144(08).

Hosseinian, S M and Carmichael, D G (2013) Optimal Incentive Contract with Risk-Neutral Contractor. Journal of Construction Engineering and Management, 139(08), 899–909.

Hu, W, Dong, J, Hwang, B, Ren, R and Chen, Z (2020) Network planning of urban underground logistics system with hub-and-spoke layout: two phase cluster-based approach. Engineering, Construction and Architectural Management, 27(08), 2079–105.

Hu, X, Chong, H, Wang, X and London, K (2019) Understanding Stakeholders in Off-Site Manufacturing: A Literature Review. Journal of Construction Engineering and Management, 145(08).

Hu, Y, Castro-Lacouture, D, Eastman, C M and Navathe, S B (2021) Component Change List Prediction for BIM-Based Clash Resolution from a Graph Perspective. Journal of Construction Engineering and Management, 147(08).

Huang, Y and Lin, T (2023) Compound deferrable options for the valuation of multi-stage infrastructure investment projects. Construction Management and Economics, 41(08), 670–86.

Huang, Y, Trinh, M T and Le, T (2021) Critical Factors Affecting Intention of Use of Augmented Hearing Protection Technology in Construction. Journal of Construction Engineering and Management, 147(08).

Hudak, D and Maxwell, M (2007) A macro approach to estimating correlated random variables in engineering production projects. Construction Management and Economics, 25(08), 883–92.

Hui, E C-M, Ng, I and Lau, O M-F (2011) Speculative bubbles in mass and luxury properties: an investigation of the Hong Kong residential market. Construction Management and Economics, 29(08), 781–93.

Huuhka, S (2016) Vacant residential buildings as potential reserves: A geographical and statistical study. Building Research & Information, 44(08), 816-39.

Hwang, S, Park, M, Lee, H and Lee, S (2016) Hybrid Simulation Framework for Immediate Facility Restoration Planning after a Catastrophic Disaster. Journal of Construction Engineering and Management, 142(08).

Hyari, K H, El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(08), 749–61.

Ibrahim, M W, Hanna, A S, Russell, J S, Abotaleb, I S and El-adaway, I H (2020) Quantitative Analysis of the Impacts of Out-of-Sequence Work on Project Performance. Journal of Construction Engineering and Management, 146(08).

Ikpe, E, Hammon, F and Oloke, D (2012) Cost-Benefit Analysis for Accident Prevention in Construction Projects. Journal of Construction Engineering and Management, 138(08), 991–8.

Ilozor, B D (2009) Differential management of waste by construction sectors: a case study in Michigan, USA. Construction Management and Economics, 27(08), 763–70.

Imbeah, W and Guikema, S (2009) Managing Construction Projects Using the Advanced Programmatic Risk Analysis and Management Model. Journal of Construction Engineering and Management, 135(08), 772–81.

Imriyas, K, Low, S P, Teo, A L and Chan, S L (2008) Premium-Rating Model for Workers’ Compensation Insurance in Construction. Journal of Construction Engineering and Management, 134(08), 601–17.

Islam, M M and Mohamed, S (2009) Bid-Winning Potential Optimization for Concession Schemes with Imprecise Investment Parameters. Journal of Construction Engineering and Management, 135(08), 690–700.

Islam, M S, Mohandes, S R, Mahdiyar, A, Fallahpour, A and Olanipekun, A O (2022) A Coupled Genetic Programming Monte Carlo Simulation–Based Model for Cost Overrun Prediction of Thermal Power Plant Projects. Journal of Construction Engineering and Management, 148(08).

Ivory, C (2005) The cult of customer responsiveness: is design innovation the price of a client-focused construction industry?. Construction Management and Economics, 23(08), 861-70.

Iyer, K C and Jha, K N (2006) Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects. Journal of Construction Engineering and Management, 132(08), 871–81.

Iyer, K C and Sagheer, M (2011) A real options based traffic risk mitigation model for build-operate-transfer highway projects in India. Construction Management and Economics, 29(08), 771–9.

JaÅ›kowski, P and Sobotka, A (2006) Scheduling Construction Projects Using Evolutionary Algorithm. Journal of Construction Engineering and Management, 132(08), 861–70.

Jacob, J and Varghese, K (2018) A framework for ad hoc information management for the building design process. Engineering, Construction and Architectural Management, 25(08), 1034–52.

Jacobsson, M and Merschbrock, C (2018) BIM coordinators: a review. Engineering, Construction and Architectural Management, 25(08), 989–1008.

Jafari, A, Valentin, V and Berrens, R P (2017) Estimating the Economic Value of Energy Improvements in U.S. Residential Housing. Journal of Construction Engineering and Management, 143(08).

Jarkas, A M and Horner, R M W (2015) Creating a baseline for labour productivity of reinforced concrete building construction in Kuwait. Construction Management and Economics, 33(08), 625-39.

Javernick-Will, A N (2009) Organizational learning during internationalization: acquiring local institutional knowledge. Construction Management and Economics, 27(08), 783–97.

Jeelani, I, Han, K and Albert, A (2020) Development of virtual reality and stereo-panoramic environments for construction safety training. Engineering, Construction and Architectural Management, 27(08), 1853–76.

Jens, K and Gregg, J S (2021) The impact on human behaviour in shared building spaces as a result of COVID-19 restrictions. Building Research & Information, 49(08), 827–41.

Ji, S, Park, M and Lee, H (2010) Data Preprocessing–Based Parametric Cost Model for Building Projects: Case Studies of Korean Construction Projects. Journal of Construction Engineering and Management, 136(08), 844–53.

Ji, W and AbouRizk, S M (2018) Data-Driven Simulation Model for Quality-Induced Rework Cost Estimation and Control Using Absorbing Markov Chains. Journal of Construction Engineering and Management, 144(08).

Ji, W, AbouRizk, S M, Zaïane, O R and Li, Y (2018) Complexity Analysis Approach for Prefabricated Construction Products Using Uncertain Data Clustering. Journal of Construction Engineering and Management, 144(08).

Ji, Y, Qi, K, Qi, Y, Li, Y, Li, H X, Lei, Z and Liu, Y (2020) BIM-based life-cycle environmental assessment of prefabricated buildings. Engineering, Construction and Architectural Management, 27(08), 1703–25.

Jiang, Y and Bai, Y (2020) Estimation of Construction Site Elevations Using Drone-Based Orthoimagery and Deep Learning. Journal of Construction Engineering and Management, 146(08).

Jin, R, Zou, Y, Gidado, K, Ashton, P and Painting, N (2019) Scientometric analysis of BIM-based research in construction engineering and management. Engineering, Construction and Architectural Management, 26(08), 1750–76.

Jin, R, Zuo, J and Jong, J (2019) Scientometric Review of Articles Published in ASCE’s Journal of Construction Engineering and Management from 2000 to 2018. Journal of Construction Engineering and Management, 145(08), 06019001.

Kadefors, A (2005) Fairness in interorganizational project relations: norms and strategies. Construction Management and Economics, 23(08), 871–8.

Kaiser, M J and Iledare, W O (2006) The Gulf of Mexico Decommissioning Market. Journal of Construction Engineering and Management, 132(08), 815–26.

Kalantari, S, Cruz-Garza, J, Xu, T B, Mostafavi, A and Gao, E (2023) Store layout design and consumer response: a behavioural and EEG study. Building Research & Information, 51(08), 897–914.

Kammouh, O, Nogal, M, Binnekamp, R and Wolfert, A R M ( (2021) Mitigation Controller: Adaptive Simulation Approach for Planning Control Measures in Large Construction Projects. Journal of Construction Engineering and Management, 147(08).

Kang, Y, Siddiqui, S, Suk, S J, Chi, S and Kim, C (2017) Trends of Fall Accidents in the U.S. Construction Industry. Journal of Construction Engineering and Management, 143(08).

Kataoka, M (2008) Automated Generation of Construction Plans from Primitive Geometries. Journal of Construction Engineering and Management, 134(08), 592–600.

Kazar, G and Comu, S (2021) Effectiveness of Serious Games for Safety Training: A Mixed Method Study. Journal of Construction Engineering and Management, 147(08).

Kenley, R (2001) The predictive ability of Bromilow's time-cost model: a comment. Construction Management and Economics, 19(08), 759-64.

Kent, D C and Becerik-Gerber, B (2010) Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery. Journal of Construction Engineering and Management, 136(08), 815–25.

Kibert, C J, Sendzimir, J and Guy, B (2000) Construction ecology and metabolism: natural system analogues for a sustainable built environment. Construction Management and Economics, 18(08), 903-16.

Kifokeris, D and Xenidis, Y (2017) Constructability: Outline of Past, Present, and Future Research. Journal of Construction Engineering and Management, 143(08).

Kim, A and Arditi, D (2010) Performance of minority firms providing construction management services in the US transportation sector. Construction Management and Economics, 28(08), 51.

Kim, B and Kim, S J (2015) Credibility Evaluation of Project Duration Forecast Using Forecast Sensitivity and Forecast-Risk Compatibility. Journal of Construction Engineering and Management, 141(08).

Kim, B and Reinschmidt, K F (2010) Probabilistic Forecasting of Project Duration Using Kalman Filter and the Earned Value Method. Journal of Construction Engineering and Management, 136(08), 834–43.

Kim, B, Lee, H, Park, H and Kim, H (2012) Greenhouse Gas Emissions from Onsite Equipment Usage in Road Construction. Journal of Construction Engineering and Management, 138(08), 982–90.

Kim, J J, Miller, J A and Kim, S (2020) Cost Impacts of Change Orders due to Unforeseen Existing Conditions in Building Renovation Projects. Journal of Construction Engineering and Management, 146(08).

Kim, K, Cho, Y and Kim, K (2018) BIM-Driven Automated Decision Support System for Safety Planning of Temporary Structures. Journal of Construction Engineering and Management, 144(08).

Kim, T W and Fischer, M (2014) Ontology for Representing Building Users’ Activities in Space-Use Analysis. Journal of Construction Engineering and Management, 140(08).

Knauseder, I, Josephson, P-E and Styhre, A (2007) Learning approaches for housing, service and infrastructure project organizations. Construction Management and Economics, 25(08), 857–67.

Koch, C (2012) Contested overruns and performance of offshore wind power plants. Construction Management and Economics, 30(08), 609-22.

Koo, D and Ariaratnam, S T (2008) Application of a Sustainability Model for Assessing Water Main Replacement Options. Journal of Construction Engineering and Management, 134(08), 563–74.

Koo, H J and O’Connor, J T (2022) A Strategy for Building Design Quality Improvement through BIM Capability Analysis. Journal of Construction Engineering and Management, 148(08).

Korkmaz, S, Riley, D and Horman, M (2010) Piloting Evaluation Metrics for Sustainable High-Performance Building Project Delivery. Journal of Construction Engineering and Management, 136(08), 877–85.

Kremers, J, Rietjens, B, Voordijk, H and De Boer, S J (2010) Construction contracting and civil-military interaction. Construction Management and Economics, 28(08), 83.

Kululanga, G K and Price, A D (2005) Measuring Quality of Writing of Construction Specifications. Journal of Construction Engineering and Management, 131(08), 859–65.

Kurokawa, M, Schweber, L and Hughes, W (2017) Client engagement and building design: The view from actor-network theory. Building Research & Information, 45(08), 910-25.

Kuusk, K and Kalamees, T (2016) Retrofit cost-effectiveness: Estonian apartment buildings. Building Research & Information, 44(08), 920-34.

Kwon, N, Cho, J, Lee, H, Yoon, I and Park, M (2019) Compensation Cost Estimation Model for Construction Noise Claims Using Case-Based Reasoning. Journal of Construction Engineering and Management, 145(08).

Lai, A W Y and Pang, P S M (2010) Measuring Performance for Building Maintenance Providers. Journal of Construction Engineering and Management, 136(08), 864–76.

Langford, D A and Robson, P (2003) The representation of the professions in the cinema: the case of construction engineers and lawyers. Construction Management and Economics, 21(08), 799-807.

Langford, D A, Kennedy, P, Conlin, J and McKenzie, N (2003) Comparison of construction costs on motorway projects using measure and value and alternative tendering initiative contractual arrangements. Construction Management and Economics, 21(08), 831-40.

Larsen, G D (2005) Horses for courses: relating innovation diffusion concepts to the stages of the diffusion process. Construction Management and Economics, 23(08), 787-92.

Laryea, S (2013) Nature of Tender Review Meetings. Journal of Construction Engineering and Management, 139(08), 927–40.

Lau, S, Lu, M and Poon, C (2014) Formalized Approach to Discretize a Continuous Plant in Construction Simulations. Journal of Construction Engineering and Management, 140(08).

Lavers, A P and Shiers, D E (2000) Construction law and environmental harm: the liability interface. Construction Management and Economics, 18(08), 893-902.

Lawrence, R, Elsayed, M and Keime, C (2019) Evaluation of environmental design strategies for university buildings. Building Research & Information, 47(08), 883–900.

Le, C, Jeong, H D, Damnjanovic, I and Bukkapatnam, S (2022) Pareto Principle in Scoping-Phase Cost Estimating: A Multiobjective Optimization Approach for Selecting and Applying Optimal Major Work Items. Journal of Construction Engineering and Management, 148(08).

Le, C, Le, T, Jeong, H D and Lee, E (2019) Geographic Information System–Based Framework for Estimating and Visualizing Unit Prices of Highway Work Items. Journal of Construction Engineering and Management, 145(08).

Lee, B, Lee, H, Park, M and Kim, H (2015) Influence Factors of Learning-Curve Effect in High-Rise Building Constructions. Journal of Construction Engineering and Management, 141(08).

Lee, C, Chong, H, Tanko, B L and Klufallah, M (2022) Effect between Trust in Communication Technology and Interorganizational Trust in BIM-Enabled Projects. Journal of Construction Engineering and Management, 148(08).

Lee, G H, Kim, J I, Koo, C and Kim, T W (2022) Automated Generation of Precast Concrete Slab Stacks for Transportation in Offsite Construction Projects. Journal of Construction Engineering and Management, 148(08).

Lee, J (2018) Value Engineering for Defect Prevention on Building Façade. Journal of Construction Engineering and Management, 144(08).

Lee, N and Rojas, E M (2013) Visual Representations for Monitoring Project Performance: Developing Novel Prototypes for Improved Communication. Journal of Construction Engineering and Management, 139(08), 994–1005.

Lee, S, Peña-Mora, F and Park, M (2005) Quality and Change Management Model for Large Scale Concurrent Design and Construction Projects. Journal of Construction Engineering and Management, 131(08), 890–902.

Leo, L S, Buccolieri, R and Di Sabatino, S (2018) Scale-adaptive morphometric analysis for urban air quality and ventilation applications. Building Research & Information, 46(08), 931–51.

Leung, M, Chan, Y and Olomolaiye, P (2008) Impact of Stress on the Performance of Construction Project Managers. Journal of Construction Engineering and Management, 134(08), 644–52.

Leung, M, Chan, Y, Chong, A and Sham, J F (2008) Developing Structural Integrated Stressor–Stress Models for Clients’ and Contractors’ Cost Engineers. Journal of Construction Engineering and Management, 134(08), 635–43.

Lewis, T M and Hosein, R (2006) An estimation of the size of the hidden labour force in construction in Trinidad and Tobago. Construction Management and Economics, 24(08), 805-15.

Li, H X, Ma, Z, Liu, H, Wang, J, Al-Hussein, M and Mills, A (2020) Exploring and verifying BIM-based energy simulation for building operations. Engineering, Construction and Architectural Management, 27(08), 1679–702.

Li, H, Lv, L, Zuo, J, Su, L, Wang, L and Yuan, C (2020) Dynamic Reputation Incentive Mechanism for Urban Water Environment Treatment PPP Projects. Journal of Construction Engineering and Management, 146(08).

Li, J, Wang, H, Xie, Y and Zeng, W (2020) Human Error Identification and Analysis for Shield Machine Operation Using an Adapted TRACEr Method. Journal of Construction Engineering and Management, 146(08).

Li, Q, Sun, Q, Tao, S and Gao, X (2019) Multi-skill project scheduling with skill evolution and cooperation effectiveness. Engineering, Construction and Architectural Management, 27(08), 2023–45.

Li, S and Liu, M (2023) Reasonable kitchen space for urban residences: based on an investigation in Beijing. Building Research & Information, 51(08), 881–96.

Li, X, Li, J, Zhang, X, Gao, J and Zhang, C (2020) Simplified analysis of cable-stayed bridges with longitudinal viscous dampers. Engineering, Construction and Architectural Management, 27(08), 1993–2022.

Liang, R and Chong, H (2019) A hybrid group decision model for green supplier selection: a case study of megaprojects. Engineering, Construction and Architectural Management, 26(08), 1712–34.

Lingard, H C, Cooke, T and Blismas, N (2010) Safety climate in conditions of construction subcontracting: a multi-level analysis. Construction Management and Economics, 28(08), 25.

Lingard, H, Gilbert, G and Graham, P (2001) Improving solid waste reduction and recycling performance using goal setting and feedback. Construction Management and Economics, 19(08), 809-17.

Liu, A M-M, Fellows, R and Fang, Z (2003) The power paradigm of project leadership. Construction Management and Economics, 21(08), 819-29.

Liu, Y, Habibnezhad, M, Shayesteh, S, Jebelli, H and Lee, S (2021) Paving the Way for Future EEG Studies in Construction: Dependent Component Analysis for Automatic Ocular Artifact Removal from Brainwave Signals. Journal of Construction Engineering and Management, 147(08).

Liu, Y, Yao, F, Ji, Y, Tong, W, Liu, G, Li, H X and Hu, X (2022) Quality Control for Offsite Construction: Review and Future Directions. Journal of Construction Engineering and Management, 148(08).

Locatelli, G and Mancini, M (2012) Looking back to see the future: building nuclear power plants in Europe. Construction Management and Economics, 30(08), 623-37.

London, K A and Kenley, R (2001) An industrial organization economic supply chain approach for the construction industry: a review. Construction Management and Economics, 19(08), 777-88.

Loosemore, M, Alkilani, S Z and Hammad, A W A (2021) The job-seeking experiences of migrants and refugees in the Australian construction industry. Building Research & Information, 49(08), 912–29.

Lou, J, Lu, W, Xu, J, Li, X and Wang, J (2022) Nomenclature for offsite construction. Building Research & Information, 50(08), 894–908.

Loudoun, R and Markwell, K (2017) Energy Drink Consumption in the Australian Construction Industry: A Risky New Trend?. Journal of Construction Engineering and Management, 143(08).

Love, P E D and Teo, P (2017) Statistical Analysis of Injury and Nonconformance Frequencies in Construction: Negative Binomial Regression Model. Journal of Construction Engineering and Management, 143(08).

Love, P E D, Teo, P, Morrison, J and Grove, M (2016) Quality and Safety in Construction: Creating a No-Harm Environment. Journal of Construction Engineering and Management, 142(08).

Low, S P and Min, W (2005) Just-in-time management in the ready mixed concrete industries of Chongqing, China and Singapore. Construction Management and Economics, 23(08), 815-29.

Low, S P and Tan, G S L (2002) Relationship marketing: a survey of QS firms in Singapore. Construction Management and Economics, 20(08), 707-21.

Lu, H, Qi, J, Li, J, Xie, Y, Xu, G and Wang, H (2020) Multi-agent based safety computational experiment system for shield tunneling projects. Engineering, Construction and Architectural Management, 27(08), 1963–91.

Lu, Y, Cui, Q and Le, Y (2013) Turning Green to Gold in the Construction Industry: Fable or Fact?. Journal of Construction Engineering and Management, 139(08), 1026–36.

Luo, X, Li, H, Huang, T and Skitmore, M (2016) Quantifying Hazard Exposure Using Real-Time Location Data of Construction Workforce and Equipment. Journal of Construction Engineering and Management, 142(08).

Macarulla, M, Forcada, N, Casals, M, Gangolells, M, Fuertes, A and Roca, X (2013) Standardizing Housing Defects: Classification, Validation, and Benefits. Journal of Construction Engineering and Management, 139(08), 968–76.

Madter, N, Brookes, N J, Bower, D A and Hagan, G (2012) Exploring project management continuing professional development in engineering construction. Construction Management and Economics, 30(08), 639-51.

Maemura, Y, Kim, E and Ozawa, K (2018) Root Causes of Recurring Contractual Conflicts in International Construction Projects: Five Case Studies from Vietnam. Journal of Construction Engineering and Management, 144(08).

Manahasa, O and Manahasa, E (2022) Trained and untrained children explore school spaces in Albania: assessment and participation in children’s well-being. Building Research & Information, 50(08), 827–44.

Manley, K, McFallan, S and Kajewski, S (2009) Relationship between Construction Firm Strategies and Innovation Outcomes. Journal of Construction Engineering and Management, 135(08), 764–71.

Manley, S and Graft-Johnson, A D (2013) Towards inclusion: rethinking architectural education. Construction Management and Economics, 31(08), 914-27.

Marín, L S and Roelofs, C (2017) Promoting Construction Supervisors’ Safety-Efficacy to Improve Safety Climate: Training Intervention Trial. Journal of Construction Engineering and Management, 143(08).

Marchant, T (2013) Keep going: career perspectives on ageing and masculinity of self-employed tradesmen in Australia. Construction Management and Economics, 31(08), 845-60.

Marks, E D, Cheng, T and Teizer, J (2013) Laser Scanning for Safe Equipment Design That Increases Operator Visibility by Measuring Blind Spots. Journal of Construction Engineering and Management, 139(08), 1006–14.

Marocco, M and Garofolo, I (2021) Operational text-mining methods for enhancing building maintenance management. Building Research & Information, 49(08), 893–911.

Marzouk, M, Said, H and El-Said, M (2009) Framework for Multiobjective Optimization of Launching Girder Bridges. Journal of Construction Engineering and Management, 135(08), 791–800.

Matar, M, Osman, H, Georgy, M, Abou-Zeid, A and Elsaid, M (2020) Evaluating the environmental performance of pipeline construction using systems modelling. Construction Management and Economics, 38(08), 689–714.

Matos, R, Rodrigues, H, Costa, A, Requejo, C and Rodrigues, F (2023) Facility manager perspectives on building condition assessment for Portuguese higher education institutions. Building Research & Information, 51(08), 949–64.

Mattar, M H and Cheah, C Y J (2006) Valuing large engineering projects under uncertainty: private risk effects and real options. Construction Management and Economics, 24(08), 847-60.

Mello Saraiva Caldeira, L M and Brito, A (2014) Use of Soil-Rock Mixtures in Dam Construction. Journal of Construction Engineering and Management, 140(08).

Menches, C L, Hanna, A S, Nordheim, E V and Russell, J S (2008) Impact of pre-construction planning and project characteristics on performance in the US electrical construction industry. Construction Management and Economics, 26(08), 855–69.

Meng, J, Yan, J, Xue, B, Fu, J and He, N (2018) Reducing construction material cost by optimizing buy-in decision that accounts the flexibility of non-critical activities. Engineering, Construction and Architectural Management, 25(08), 1092–108.

Meng, Q, Zhang, Y, Li, Z, Shi, W, Wang, J, Sun, Y, Xu, L and Wang, X (2020) A review of integrated applications of BIM and related technologies in whole building life cycle. Engineering, Construction and Architectural Management, 27(08), 1647–77.

Mergel, C, Decker, T and Menrad, K (2023) Affinity towards flexible housing – a study among homeowners in Germany. Building Research & Information, 51(08), 871–80.

Migliore, A, Rossi-Lamastra, C and Tagliaro, C (2022) Are workspaces gender neutral? A literature review and a research agenda. Building Research & Information, 50(08), 924–48.

Minchin, R E, Thurn, S B, Ellis, R D and Lewis, D W (2013) Using Contractor Bid Amounts to Estimate the Impact of Night Construction on Cost for Transportation Construction. Journal of Construction Engineering and Management, 139(08), 1055–62.

Mmereki, D and Brouwer, D (2022) Application of Innovative Materials and Methods in Green Buildings and Associated Occupational Exposure and Health of Construction Workers: A Systematic Literature Review. Journal of Construction Engineering and Management, 148(08).

Moradi, S and Sormunen, P (2023) Revisiting the concept of waste and its causes in construction from analytical and conceptual perspectives. Construction Management and Economics, 41(08), 621–33.

Mostafavi, A and Karamouz, M (2010) Selecting Appropriate Project Delivery System: Fuzzy Approach with Risk Analysis. Journal of Construction Engineering and Management, 136(08), 923–30.

Mostafavi, A, Abraham, D, Noureldin, S, Pankow, G, Novak, J, Walker, R, Hall, K and George, B (2013) Risk-Based Protocol for Inspection of Transportation Construction Projects Undertaken by State Departments of Transportation. Journal of Construction Engineering and Management, 139(08), 977–86.

Moussourakis, J and Haksever, C (2007) Models for Accurate Computation of Earliest and Latest Start Times and Optimal Compression in Project Networks. Journal of Construction Engineering and Management, 133(08), 600–8.

Mulville, M, Jones, K, Huebner, G and Powell-Greig, J (2017) Energy-saving occupant behaviours in offices: Change strategies. Building Research & Information, 45(08), 861-74.

Murillo, K P, Rocha, E and Rodrigues, M F (2019) Construction sectors efficiency analysis on seven European countries. Engineering, Construction and Architectural Management, 26(08), 1801–19.

Myers, D (2005) A review of construction companies' attitudes to sustainability. Construction Management and Economics, 23(08), 781-5.

Naderpajouh, N, Mahdavi, A, Hastak, M and Aldrich, D P (2014) Modeling Social Opposition to Infrastructure Development. Journal of Construction Engineering and Management, 140(08).

Nasrazadani, H, Mahsuli, M, Talebiyan, H and Kashani, H (2017) Probabilistic Modeling Framework for Prediction of Seismic Retrofit Cost of Buildings. Journal of Construction Engineering and Management, 143(08).

Nassar, K and Hosny, O (2012) Solving the Least-Cost Route Cut and Fill Sequencing Problem Using Particle Swarm. Journal of Construction Engineering and Management, 138(08), 931–42.

Nassar, N and AbouRizk, S (2016) Introduction to Techniques for Resolving Project Performance Contradictions. Journal of Construction Engineering and Management, 142(08).

Naumets, S and Lu, M (2021) Investigation into Explainable Regression Trees for Construction Engineering Applications. Journal of Construction Engineering and Management, 147(08).

Newcombe, R (2003) From client to project stakeholders: a stakeholder mapping approach. Construction Management and Economics, 21(08), 841-8.

Nguyen, H D, Nguyen, L D, Chih, Y and Le-Hoai, L (2017) Influence of Participants’ Characteristics on Sustainable Building Practices in Emerging Economies: Empirical Case Study. Journal of Construction Engineering and Management, 143(08).

Nguyen, L D and Ibbs, W (2010)  Case Law and Variations in Cumulative Impact Productivity Claims. Journal of Construction Engineering and Management, 136(08), 826–33.

Nguyen, L D, Phan, D H and Tang, L C M (2013) Simulating Construction Duration for Multistory Buildings with Controlling Activities. Journal of Construction Engineering and Management, 139(08), 951–9.

Nguyen, T H D, Chileshe, N and Rameezdeen, R (2018) External stakeholder strategic actions in construction projects: a Vietnamese study. Construction Management and Economics, 36(08), 443–58.

Nima, M A, Abdul-Kadir, M R, Jaafar, M S and Alghulami, R G (2001) Constructability implementation: a survey in the Malaysian construction industry. Construction Management and Economics, 19(08), 819-29.

Obeidat, B and Jaradat, E A R (2022) The influence of virtual human representations on first-year architecture students’ perceptions of digitally designed spaces: a pilot study. Building Research & Information, 50(08), 845–58.

Ofori, G, Briffett, C, Gang, G and Ranasinghe, M (2000) Impact of ISO 14000 on construction enterprises in Singapore. Construction Management and Economics, 18(08), 935-47.

Ormerod, M and Newton, R (2013) Construction as a career choice for young disabled people: dispelling the myths. Construction Management and Economics, 31(08), 928-38.

Ortlepp, R, Gruhler, K and Schiller, G (2016) Material stocks in Germany's non-domestic buildings: A new quantification method. Building Research & Information, 44(08), 840-62.

Ozdemir, B and Kumral, M (2017) Stochastic Assessment of the Material Haulage Efficiency in the Earthmoving Industry. Journal of Construction Engineering and Management, 143(08).

Palme, M, Inostroza, L and Salvati, A (2018) Technomass and cooling demand in South America: a superlinear relationship?. Building Research & Information, 46(08), 864–80.

Park, E, Kwon, S J and Han, J (2019) Antecedents of the adoption of building information modeling technology in Korea. Engineering, Construction and Architectural Management, 26(08), 1735–49.

Pasquire, C (2012) Positioning Lean within an exploration of engineering construction. Construction Management and Economics, 30(08), 673-85.

Perttula, P, Korhonen, P, Lehtelä, J, Rasa, P, Kitinoja, J, Mäkimattila, S and Leskinen, T (2006) Improving the Safety and Efficiency of Materials Transfer at a Construction Site by Using an Elevator. Journal of Construction Engineering and Management, 132(08), 836–43.

Poh, Y P and Tah, J H M (2006) Integrated duration-cost influence network for modelling risk impacts on construction tasks. Construction Management and Economics, 24(08), 861-8.

Poleacovschi, C and Javernick-Will, A (2017) Who Are the Experts? Assessing Expertise in Construction and Engineering Organizations. Journal of Construction Engineering and Management, 143(08).

Pomares, J C, González, A and Saura, P (2018) Simple and Resistant Construction Built with Concrete Voussoirs for Developing Countries. Journal of Construction Engineering and Management, 144(08).

Pomares, J C, Irles, R, Segovia, E and Ferrer, B (2014) Acceleration and Deflection Analysis for Class C Edge Protection Systems in Construction Work. Journal of Construction Engineering and Management, 140(08).

Poon, C S, Yu, A T W, See, S C and Cheung, E (2004) Minimizing demolition wastes in Hong Kong public housing projects. Construction Management and Economics, 22(08), 799-805.

Porwal, A and Hewage, K N (2012) Building Information Modeling–Based Analysis to Minimize Waste Rate of Structural Reinforcement. Journal of Construction Engineering and Management, 138(08), 943–54.

Prieto, A J (2021) Fuzzy systems in the digital management of heritage timber buildings in South Chile. Building Research & Information, 49(08), 878–92.

Pryke, S D (2004) Analysing construction project coalitions: exploring the application of social network analysis. Construction Management and Economics, 22(08), 787-97.

Pryke, S, Lunic, D and Badi, S (2015) The effect of leader emotional intelligence on leader–follower chemistry: a study of construction project managers. Construction Management and Economics, 33(08), 603-24.

Puddicombe, M S (2009) Why Contracts: Evidence. Journal of Construction Engineering and Management, 135(08), 675–82.

Pulaski, M H and Horman, M J (2005) Organizing Constructability Knowledge for Design. Journal of Construction Engineering and Management, 131(08), 911–9.

Puri, V and Martinez, J C (2013) Modeling of Simultaneously Continuous and Stochastic Construction Activities for Simulation. Journal of Construction Engineering and Management, 139(08), 1037–45.

Qian, Q and Zhang, L (2018) Impact of Regulatory Focus on Choice of Project-Governance Modes: Role of Tolerance of Opportunistic Behavior. Journal of Construction Engineering and Management, 144(08).

Qiao, Y, Fricker, J D and Labi, S (2019) Influence of Project Bundling on Maintenance of Traffic Costs across Highway Project Types. Journal of Construction Engineering and Management, 145(08).

Ragab, M A and Marzouk, M (2021) BIM Adoption in Construction Contracts: Content Analysis Approach. Journal of Construction Engineering and Management, 147(08).

Raidén, A B, Dainty, A R J and Neale, R H (2006) Balancing employee needs, project requirements and organisational priorities in team deployment. Construction Management and Economics, 24(08), 883-95.

Raiden, A B and Räisänen, C (2013) Striving to achieve it all: men and work-family-life balance in Sweden and the UK. Construction Management and Economics, 31(08), 899-913.

Rajagopalan, G (2019) Durability of alumina silicate concrete based on slag/fly ash blends against corrosion. Engineering, Construction and Architectural Management, 26(08), 1641–51.

Rajala, P, Ylä-Kujala, A, Sinkkonen, T and Kärri, T (2023) Building renovation business: the effects of specialization on profitability. Construction Management and Economics, 41(08), 687–702.

Riggio, M and Dilmaghani, M (2020) Structural health monitoring of timber buildings: a literature survey. Building Research & Information, 48(08), 817–37.

Riley, D R, Varadan, P, James, J S and Thomas, H R (2005) Benefit-Cost Metrics for Design Coordination of Mechanical, Electrical, and Plumbing Systems in Multistory Buildings. Journal of Construction Engineering and Management, 131(08), 877–89.

Rohani, M, Shafabakhsh, G, Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(08), 1053–74.

Rosander, L and Kadefors, A (2023) Implementing relational contracting in a public client organization: the influence of policy clashes, resources and project autonomy. Construction Management and Economics, 41(08), 651–69.

Rosner, J W, Thal, A E and West, C J (2009) Analysis of the Design-Build Delivery Method in Air Force Construction Projects. Journal of Construction Engineering and Management, 135(08), 710–7.

Rowlinson, S M and Yates, D (2003) nDCAD: a virtual change agent for professions and procurement systems?. Construction Management and Economics, 21(08), 849-57.

Ruge, J, Dimitrova, V, Grubbauer, M and Bögle, A (2022) Models, mock-ups and materials: artefacts of collaboration in the planning of large-scale construction projects. Building Research & Information, 50(08), 881–93.

Rumens, N (2013) Queering men and masculinities in construction: towards a research agenda. Construction Management and Economics, 31(08), 802-15.

Ryu, J, Alwasel, A, Haas, C T and Abdel-Rahman, E (2020) Analysis of Relationships between Body Load and Training, Work Methods, and Work Rate: Overcoming the Novice Mason’s Risk Hump. Journal of Construction Engineering and Management, 146(08).

Sacks, R and Harel, M (2006) An economic game theory model of subcontractor resource allocation behaviour. Construction Management and Economics, 24(08), 869-81.

Sacks, R, Rozenfeld, O and Rosenfeld, Y (2009) Spatial and Temporal Exposure to Safety Hazards in Construction. Journal of Construction Engineering and Management, 135(08), 726–36.

Sage, D, Vitry, C, Dainty, A and Barnard, S (2021) Towards a new theory of construction innovation: a socio-material analysis of classification work. Construction Management and Economics, 39(08), 637–51.

Sawan, R, Low, J F and Schiffauerova, A (2018) Quality cost of material procurement in construction projects. Engineering, Construction and Architectural Management, 25(08), 974–88.

Schöttle, A and Arroyo, P (2017) Comparison of Weighting-Rating-Calculating, Best Value, and Choosing by Advantages for Bidder Selection. Journal of Construction Engineering and Management, 143(08).

Selçuk Çıdık, M, Boyd, D and Thurairajah, N (2017) Innovative Capability of Building Information Modeling in Construction Design. Journal of Construction Engineering and Management, 143(08).

Senouci, A and El-Rayes, K (2009) Time-Profit Trade-Off Analysis for Construction Projects. Journal of Construction Engineering and Management, 135(08), 718–25.

Sepasgozar, S M, Davis, S, Loosemore, M and Bernold, L (2018) An investigation of modern building equipment technology adoption in the Australian construction industry. Engineering, Construction and Architectural Management, 25(08), 1075–91.

Seyis, S (2019) Pros and Cons of Using Building Information Modeling in the AEC Industry. Journal of Construction Engineering and Management, 145(08).

Sha, K (2019) Incentive strategies for construction project manager: a common agency perspective. Construction Management and Economics, 37(08), 461–71.

Sherman, R, Gibson, G E, Merrow, E and Parrish, K (2021) Examining the Impact of Rate-of-Return Regulation on Capital Project Planning. Journal of Construction Engineering and Management, 147(08).

Short, C A, Song, J, Mottet, L, Chen, S, Wu, J and Ge, J (2018) Challenges in the low-carbon adaptation of China’s apartment towers. Building Research & Information, 46(08), 899–930.

Shrestha, K J, Jeong, H D and Gransberg, D D (2017) Multidimensional Highway Construction Cost Indexes Using Dynamic Item Basket. Journal of Construction Engineering and Management, 143(08).

Siebelink, S, Voordijk, J T and Adriaanse, A (2018) Developing and Testing a Tool to Evaluate BIM Maturity: Sectoral Analysis in the Dutch Construction Industry. Journal of Construction Engineering and Management, 144(08).

Silverio-Fernandez, M A, Renukappa, S and Suresh, S (2019) Evaluating critical success factors for implementing smart devices in the construction industry. Engineering, Construction and Architectural Management, 26(08), 1625–40.

Simmons, D R, Polmear, M, Bae, H and McCall, C (2022) Applying a New Lens: Using Photo Elicitation in Construction Engineering Management Research. Journal of Construction Engineering and Management, 148(08).

Singhaputtangkul, N and Zhao, X (2016) Applying a Fuzzy Consensus Scheme to Enhance the Group Decision Making of a Building Envelope Design Team. Journal of Construction Engineering and Management, 142(08).

Skitmore, M (2008) First and second price independent values sealed bid procurement auctions: some scalar equilibrium results. Construction Management and Economics, 26(08), 787–803.

Skitmore, M and Runeson, G (2006) Bidding models: testing the stationarity assumption. Construction Management and Economics, 24(08), 791-803.

Skrzypczak, I, Oleniacz, G, Leśniak, A, Zima, K, Mrówczyńska, M and Kazak, J K (2022) Scan-to-BIM method in construction: assessment of the 3D buildings model accuracy in terms inventory measurements. Building Research & Information, 50(08), 859–80.

Smith, L (2013) Trading in gender for women in trades: embodying hegemonic masculinity, femininity and being a gender hotrod. Construction Management and Economics, 31(08), 861-73.

Son, J and Rojas, E M (2011) Evolution of Collaboration in Temporary Project Teams: An Agent-Based Modeling and Simulation Approach. Journal of Construction Engineering and Management, 137(08), 619–28.

Son, J, O’Brien, W J and Thomas, S R (2022) Recommended Practices for Effective Management of Academia–Industry Collaborative Research Teams in Construction Management. Journal of Construction Engineering and Management, 148(08).

Song, J, Fan, S, Lin, W, Mottet, L, Woodward, H, Davies Wykes, M, Arcucci, R, Xiao, D, Debay, J, ApSimon, H, Aristodemou, E, Birch, D, Carpentieri, M, Fang, F, Herzog, M, Hunt, G R, Jones, R L, Pain, C, Pavlidis, D, Robins, A G, Short, C A and Linden, P F (2018) Natural ventilation in cities: the implications of fluid mechanics. Building Research & Information, 46(08), 809–28.

Sonmez, R, Aminbakhsh, S and Atan, T (2020) Activity Uncrashing Heuristic with Noncritical Activity Rescheduling Method for the Discrete Time-Cost Trade-Off Problem. Journal of Construction Engineering and Management, 146(08).

Sousa, V, Almeida, N M and Dias, L A (2014) Role of Statistics and Engineering Judgment in Developing Optimized Time-Cost Relationship Models. Journal of Construction Engineering and Management, 140(08).

Stride, M, Hon, C K, Liu, R and Xia, B (2020) The use of building information modelling by quantity surveyors in facilities management roles. Engineering, Construction and Architectural Management, 27(08), 1795–812.

Su, C T, Santoro, M C and Mendes, A B (2018) Constructive Heuristics for Project Scheduling Resource Availability Cost Problem with Tardiness. Journal of Construction Engineering and Management, 144(08).

Sundararajan, S K and Tseng, C (2017) Managing Project Performance Risks under Uncertainty: Using a Dynamic Capital Structure Approach in Infrastructure Project Financing. Journal of Construction Engineering and Management, 143(08).

Tabish, S Z S and Jha, K N (2018) Beyond the Iron Triangle in Public Construction Projects. Journal of Construction Engineering and Management, 144(08).

Tabish, S Z S and Jha, K N (2011) Identification and evaluation of success factors for public construction projects. Construction Management and Economics, 29(08), 809–23.

Tam, C M, Tong, T K L and Tse, S L (2004) Modelling hook times of mobile cranes using artificial neural networks. Construction Management and Economics, 22(08), 839-49.

Tan, T, Lu, W, Tan, G, Xue, F, Chen, K, Xu, J, Wang, J and Gao, S (2020) Construction-Oriented Design for Manufacture and Assembly Guidelines. Journal of Construction Engineering and Management, 146(08).

Tang, L, Griffith, L, Stevens, M and Hardie, M (2020) Social media analytics in the construction industry comparison study between China and the United States. Engineering, Construction and Architectural Management, 27(08), 1877–89.

Tatari, O and Kucukvar, M (2012) Sustainability Assessment of U.S. Construction Sectors: Ecosystems Perspective. Journal of Construction Engineering and Management, 138(08), 918–22.

Taylor, M D (2010) A definition and valuation of the UK offsite construction sector. Construction Management and Economics, 28(08), 96.

Taylor, T R B, Ford, D N and Reinschmidt, K F (2012) Impact of Public Policy and Societal Risk Perception on U.S. Civilian Nuclear Power Plant Construction. Journal of Construction Engineering and Management, 138(08), 972–81.

Techera, U, Hallowell, M, Littlejohn, R and Rajendran, S (2018) Measuring and Predicting Fatigue in Construction: Empirical Field Study. Journal of Construction Engineering and Management, 144(08).

Teo, E A L, Chan, S L and Tan, P H (2007) Empirical Investigation into Factors Affecting Exporting Construction Services in SMEs in Singapore. Journal of Construction Engineering and Management, 133(08), 582–91.

Tetteh, M O, Chan, A P C, Darko, A, Torku, A and Nani, G (2021) Critical Barriers to International Construction Joint Ventures Success: Multiexpert Views and Contextual Disparities. Journal of Construction Engineering and Management, 147(08).

Thomas, H R and Ellis, R D (2007) Contractor Prebid Planning Principles. Journal of Construction Engineering and Management, 133(08), 542–52.

Thomson, C S and El-Haram, M A (2019) Is the evolution of building sustainability assessment methods promoting the desired sharing of knowledge amongst project stakeholders?. Construction Management and Economics, 37(08), 433–60.

Thunberg, M and Fredriksson, A (2018) Bringing planning back into the picture – How can supply chain planning aid in dealing with supply chain-related problems in construction?. Construction Management and Economics, 36(08), 425–42.

Touran, A and Lopez, R (2006) Modeling Cost Escalation in Large Infrastructure Projects. Journal of Construction Engineering and Management, 132(08), 853–60.

Trigunarsyah, B (2004) Project owners' role in improving constructability of construction projects: an example analysis for Indonesia. Construction Management and Economics, 22(08), 861-76.

Troje, D (2023) Path dependencies and sustainable facilities management: a study of housing companies in Sweden. Building Research & Information, 51(08), 965–78.

Tsolas, I E (2011) Modelling profitability and effectiveness of Greek-listed construction firms: an integrated DEA and ratio analysis. Construction Management and Economics, 29(08), 795–807.

Turcu, C (2017) Unequal spatial distribution of retrofits in Bucharest's apartment buildings. Building Research & Information, 45(08), 892-909.

Tymvios, N and Gambatese, J A (2016) Direction for Generating Interest for Design for Construction Worker Safety—A Delphi Study. Journal of Construction Engineering and Management, 142(08).

Ugwu, O O, Arop, J B, Nwoji, C U and Osadebe, N N (2013) Nanotechnology as a Preventive Engineering Solution to Highway Infrastructure Failures. Journal of Construction Engineering and Management, 139(08), 987–93.

Vassallo, J M (2007) Implementation of Quality Criteria in Tendering and Regulating Infrastructure Management Contracts. Journal of Construction Engineering and Management, 133(08), 553–61.

Voordijk, H (2009) Construction management and economics: the epistemology of a multidisciplinary design science. Construction Management and Economics, 27(08), 713–20.

Waara, F and Bröchner, J (2006) Price and Nonprice Criteria for Contractor Selection. Journal of Construction Engineering and Management, 132(08), 797–804.

Walters, R, Jaselskis, E, Zhang, J, Mueller, K and Kaewmoracharoen, M (2008) Using Scanning Lasers to Determine the Thickness of Concrete Pavement. Journal of Construction Engineering and Management, 134(08), 583–91.

Wang, W, Gao, S, Mi, L, Xing, J, Shang, K, Qiao, Y, Fu, Y, Ni, G and Xu, N (2021) Exploring the adoption of BIM amidst the COVID-19 crisis in China. Building Research & Information, 49(08), 930–47.

Wang, X, Huang, X, Luo, Y, Pei, J and Xu, M (2018) Improving Workplace Hazard Identification Performance Using Data Mining. Journal of Construction Engineering and Management, 144(08).

Wang, Y, Shao, Z and Tiong, R L K (2021) Data-Driven Prediction of Contract Failure of Public-Private Partnership Projects. Journal of Construction Engineering and Management, 147(08).

Wang, Y, Thangasamy, V K, Tiong, R L K and Zhang, L (2022) Improved Workflow for Precast Element Design Based on BIM and Lean Construction. Journal of Construction Engineering and Management, 148(08).

Watson, K J and Whitley, T (2017) Applying social return on investment to the built environment. Building Research & Information, 45(08), 875-91.

Weidman, J, Dickerson, D E and Koebel, C T (2016) Effective Intervention Strategy to Improve Worker Readiness to Adopt Ventilated Tools. Journal of Construction Engineering and Management, 142(08).

Williams, C C, Nadin, S J and Windebank, J (2011) Undeclared work in the European construction industry: evidence from a 2007 Eurobarometer survey. Construction Management and Economics, 29(08), 853–67.

Winch, G M (2001) Governing the project process: a conceptual framework. Construction Management and Economics, 19(08), 799-808.

Wong, J M W, Chiang, Y H and Ng, T S (2008) Construction and economic development: the case of Hong Kong. Construction Management and Economics, 26(08), 815–26.

Woo, J, Rajagopalan, P, Francis, M and Garnawat, P (2021) An indoor environmental quality assessment of office spaces at an urban Australian university. Building Research & Information, 49(08), 842–58.

Wright, T (2013) Uncovering sexuality and gender: an intersectional examination of women’s experience in UK construction. Construction Management and Economics, 31(08), 832-44.

Wu, C, Song, X, Wang, T and Fang, D (2015) Core Dimensions of the Construction Safety Climate for a Standardized Safety-Climate Measurement. Journal of Construction Engineering and Management, 141(08).

Wu, H, Shen, G, Lin, X, Li, M, Zhang, B and Li, C Z (2020) Screening patents of ICT in construction using deep learning and NLP techniques. Engineering, Construction and Architectural Management, 27(08), 1891–912.

Wu, J, Kumaraswamy, M M and Soo, G (2011) Regulative Measures Addressing Payment Problems in the Construction Industry: A Calculative Understanding of Their Potential Outcomes Based on Gametric Models. Journal of Construction Engineering and Management, 137(08), 566–73.

Wu, W, Mayo, G, McCuen, T L, Issa, R R A and Smith, D K (2018) Building Information Modeling Body of Knowledge. I: Background, Framework, and Initial Development. Journal of Construction Engineering and Management, 144(08).

Wu, W, Mayo, G, McCuen, T L, Issa, R R A and Smith, D K (2018) Building Information Modeling Body of Knowledge. II: Consensus Building and Use Cases. Journal of Construction Engineering and Management, 144(08).

Wu, X, Tian, Z, Tian, C, Wang, Y and Li, J (2019) New design-day method for building cooling load calculation in China. Building Research & Information, 47(08), 901–11.

Xia, B, Skitmore, M, Wu, P and Chen, Q (2014) How Public Owners Communicate the Sustainability Requirements of Green Design-Build Projects. Journal of Construction Engineering and Management, 140(08).

Xia, N, Zhong, R, Wu, C, Wang, X and Wang, S (2017) Assessment of Stakeholder-Related Risks in Construction Projects: Integrated Analyses of Risk Attributes and Stakeholder Influences. Journal of Construction Engineering and Management, 143(08).

Xia, P, Xu, F, Zhou, T and Du, J (2022) Benchmarking Human versus Robot Performance in Emergency Structural Inspection. Journal of Construction Engineering and Management, 148(08).

Xie, W, Zhao, T, Tang, J and Zhang, Y (2017) Arch First and Beam Later: Arch-Rib Integral Installation Construction Technology for Large-Span Tied-Arch Bridge. Journal of Construction Engineering and Management, 143(08).

Xie, X, Lu, Q, Rodenas-Herraiz, D, Parlikad, A K and Schooling, J M (2020) Visualised inspection system for monitoring environmental anomalies during daily operation and maintenance. Engineering, Construction and Architectural Management, 27(08), 1835–52.

Xiong, W and Zhang, X (2016) The Real Option Value of Renegotiation in Public–Private Partnerships. Journal of Construction Engineering and Management, 142(08).

Xu, J and Zhao, S (2017) Noncooperative Game-Based Equilibrium Strategy to Address the Conflict between a Construction Company and Selected Suppliers. Journal of Construction Engineering and Management, 143(08).

Xu, M, Mei, Z, Luo, S and Tan, Y (2020) Optimization algorithms for construction site layout planning: a systematic literature review. Engineering, Construction and Architectural Management, 27(08), 1913–38.

Xu, W and Wang, T (2020) Dynamic safety prewarning mechanism of human–machine–environment using computer vision. Engineering, Construction and Architectural Management, 27(08), 1813–33.

Xu, Y, Chan, A P C and Yeung, J F Y (2010) Developing a Fuzzy Risk Allocation Model for PPP Projects in China. Journal of Construction Engineering and Management, 136(08), 894–903.

Xu, Z, Wang, X, Xiao, Y and Yuan, J (2020) Modeling and performance evaluation of PPP projects utilizing IFC extension and enhanced matter-element method. Engineering, Construction and Architectural Management, 27(08), 1763–94.

Yang, J and Tsai, M (2011) Computerizing ICBF Method for Schedule Delay Analysis. Journal of Construction Engineering and Management, 137(08), 583–91.

Yeh, H H (2018) How the capital structure of firms is determined over business cycles: further evidence from the construction industry of Taiwan. Construction Management and Economics, 36(08), 459–71.

Yeoh, J K W and Chua, D K H (2017) Optimizing Crane Selection and Location for Multistage Construction Using a Four-Dimensional Set Cover Approach. Journal of Construction Engineering and Management, 143(08).

Yevu, S K, Yu, A T W, Darko, A and Addy, M N (2021) Evaluation Model for Influences of Driving Forces for Electronic Procurement Systems Application in Ghanaian Construction Projects. Journal of Construction Engineering and Management, 147(08).

Yin, X, Chen, Y, Bouferguene, A, Zaman, H, Al-Hussein, M and Russell, R (2020) Data-Driven Framework for Modeling Productivity of Closed-Circuit Television Recording Process for Sewer Pipes. Journal of Construction Engineering and Management, 146(08).

Yip, B and Rowlinson, S (2009) Job Redesign as an Intervention Strategy of Burnout: Organizational Perspective. Journal of Construction Engineering and Management, 135(08), 737–45.

Yip, B, Rowlinson, S and Siu, O L (2008) Coping strategies as moderators in the relationship between role overload and burnout. Construction Management and Economics, 26(08), 871–82.

Yiu, T W and Lai, W Y (2009) Efficacy of Trust-Building Tactics in Construction Mediation. Journal of Construction Engineering and Management, 135(08), 683–9.

Yu, H, Tweed, T, Al-Hussein, M and Nasseri, R (2009) Development of Lean Model for House Construction Using Value Stream Mapping. Journal of Construction Engineering and Management, 135(08), 782–90.

Yu, W-d, Chang, P-l, Yao, S-H and Liu, S-J (2009) KVAM: model for measuring knowledge management performance of engineering community of practice. Construction Management and Economics, 27(08), 733–47.

Yuan, J, Li, X, Ke, Y, Xu, W and Xu, Z (2020) Developing a building information modeling–based performance management system for public–private partnerships. Engineering, Construction and Architectural Management, 27(08), 1727–62.

Yuan, X, Pan, H and Fu, B (2023) Models and analysis of stadium and commercial space integration: a case study from China. Building Research & Information, 51(08), 915–36.

Yuan, Y, Zhou, X and Zhang, X (2019) Numerical and experimental study on the characteristics of radiant ceiling systems. Building Research & Information, 47(08), 912–27.

Zarghami, S A (2022) Prioritizing Construction Activities: Addressing the Flaws of Schedule-Based Indexes. Journal of Construction Engineering and Management, 148(08).

Zayed, T M, Halpin, D W and Basha, I M (2005) Productivity and delays assessment for concrete batch plant-truck mixer operations. Construction Management and Economics, 23(08), 839-50.

Zhai, D, Goodrum, P M, Haas, C T and Caldas, C H (2009) Relationship between Automation and Integration of Construction Information Systems and Labor Productivity. Journal of Construction Engineering and Management, 135(08), 746–53.

Zhan, W and Pan, W (2020) Formulating Systemic Construction Productivity Enhancement Strategies. Journal of Construction Engineering and Management, 146(08).

Zhang, H, Tam, C M and Shi, J J (2002) Simulation-based methodology for project scheduling. Construction Management and Economics, 20(08), 667-78.

Zhang, J, Chen, F and Yuan, X (2020) Comparison of cost and schedule performance of large public projects under P3 and traditional delivery models: a Canadian study. Construction Management and Economics, 38(08), 739–55.

Zhang, J, Ouyang, Y, Li, H, Ballesteros-Pérez, P and Skitmore, M (2020) Simulation analysis of incentives on employees' acceptance of foreign joint venture management practices: a case study. Engineering, Construction and Architectural Management, 27(08), 2047–78.

Zhang, J, Wang, T and Zhang, L (2021) Legal Risk Assessment Framework for International PPP Projects Based on Metanetwork. Journal of Construction Engineering and Management, 147(08).

Zhang, L and El-Gohary, N M (2017) Human-Centered Value Analysis: Building-Value Aggregation Based on Human Values and Building-System Integration. Journal of Construction Engineering and Management, 143(08).

Zhang, R P, Holdsworth, S, Turner, M and Andamon, M M (2021) Does gender really matter? A closer look at early career women in construction. Construction Management and Economics, 39(08), 669–86.

Zhang, R P, Lingard, H and Oswald, D (2020) Impact of Supervisory Safety Communication on Safety Climate and Behavior in Construction Workgroups. Journal of Construction Engineering and Management, 146(08).

Zhang, S B and Liu, A M M (2006) Organisational culture profiles of construction enterprises in China. Construction Management and Economics, 24(08), 817-28.

Zhang, Z, Li, M, Chen, J, Wang, J and Zeng, F (2017) Innovative Construction Method for Oversized Excavations with Bipartition Walls. Journal of Construction Engineering and Management, 143(08).

Zhao, D, Simmons, D and Chen, Z (2021) Interconnectivity in Collaboration Networks Impact on Member Belongingness. Journal of Construction Engineering and Management, 147(08).

Zhao, X, Chen, L, Pan, W and Lu, Q (2017) AHP-ANP–Fuzzy Integral Integrated Network for Evaluating Performance of Innovative Business Models for Sustainable Building. Journal of Construction Engineering and Management, 143(08).

Zhao, X, Hwang, B and Low, S P (2014) Investigating Enterprise Risk Management Maturity in Construction Firms. Journal of Construction Engineering and Management, 140(08).

Zheng, J, Wen, Q and Qiang, M (2020) Understanding Demand for Project Manager Competences in the Construction Industry: Data Mining Approach. Journal of Construction Engineering and Management, 146(08).

Zheng, S and Tiong, R L K (2010) First Public-Private-Partnership Application in Taiwan’s Wastewater Treatment Sector: Case Study of the Nanzih BOT Wastewater Treatment Project. Journal of Construction Engineering and Management, 136(08), 913–22.

Zhu, L, Cheung, S O, Gao, X, Li, Q and Liu, G (2020) Success DNA of a Record-Breaking Megaproject. Journal of Construction Engineering and Management, 146(08).

Zolfagharian, S and Irizarry, J (2017) Constructability Assessment Model for Commercial Building Designs in the United States. Journal of Construction Engineering and Management, 143(08).

Zou, P X W, Chen, Y and Chan, T (2010) Understanding and Improving Your Risk Management Capability: Assessment Model for Construction Organizations. Journal of Construction Engineering and Management, 136(08), 854–63.

Zuluaga, C M, Albert, A and Arroyo, P (2018) Protecting Bridge Maintenance Workers from Falls: Evaluation and Selection of Compatible Fall Protection Supplementary Devices. Journal of Construction Engineering and Management, 144(08).