Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 158 results ...

Ökmen , Ö and ÖztaÅŸ, A (2015) Scenario-based evaluation of a cost risk model through sensitivity analysis. Engineering, Construction and Architectural Management, 22(04), 403-23.

Abdel-Wahab, M S, Dainty, A R J, Ison, S G, Bowen, P and Hazlehurst, G (2008) Trends of skills and productivity in the UK construction industry. Engineering, Construction and Architectural Management, 15(04), 372–82.

Acheamfour, V K, Kissi, E and Adjei-Kumi, T (2019) Ascertaining the impact of contractors pre-qualification criteria on project success criteria. Engineering, Construction and Architectural Management, 26(04), 618–32.

Afzal, F, Yunfei, S, Sajid, M and Afzal, F (2019) Integrated priority decision index for risk assessment in chaos: cost overruns in transport projects. Engineering, Construction and Architectural Management, 27(04), 825–49.

Ahadzie, D K, Proverbs, D G, Olomolaiye, P O and Ankrah, N A (2009) Competencies required by project managers for housing construction in Ghana: Implications for CPD agenda. Engineering, Construction and Architectural Management, 16(04), 353–75.

Ahmadian, F F A, Rashidi, T H, Akbarnezhad, A and Waller, S T (2017) BIM-enabled sustainability assessment of material supply decisions. Engineering, Construction and Architectural Management, 24(04), 668-95.

Ajayi, S O, Oyedele, L O, Kadiri, K O, Akinade, O O, Bilal, M, Owolabi, H A and Alaka, H A (2016) Competency-based measures for designing out construction waste: Task and contextual attributes. Engineering, Construction and Architectural Management, 23(04), 464-90.

Akbari, S, Khanzadi, M and Gholamian, M R (2018) Building a rough sets-based prediction model for classifying large-scale construction projects based on sustainable success index. Engineering, Construction and Architectural Management, 25(04), 534–58.

Al-Reshaid, K, Kartam, N, Tewari, N and Al-Bader, H (2005) A project control process in pre-construction phases: Focus on effective methodology. Engineering, Construction and Architectural Management, 12(04), 351–72.

Al-Sibaie, E Z, Alashwal, A M, Abdul-Rahman, H and Zolkafli, U K (2014) Determining the relationship between conflict factors and performance of international construction projects. Engineering, Construction and Architectural Management, 21(04), 369-82.

Al-Tabtabai, H, Kartam, N, Flood, I and Alex, A P (1997) Expert judgment in forecasting construction project completion. Engineering, Construction and Architectural Management, 4(04), 271–93.

Attar, A, Boudjakdji, M A, Bhuiyan, N, Grine, K, Kenai, S and Aoubed, A (2009) Integrating numerical tools in underground construction process. Engineering, Construction and Architectural Management, 16(04), 376–91.

Bai, Y, Kim, S H and Burkett, W R (2007) Enhancing the capability of rapid bridge replacement after extreme events. Engineering, Construction and Architectural Management, 14(04), 375–86.

Baird, A (1995) Pioneering the NEC system of documents. Engineering, Construction and Architectural Management, 2(04), 249–69.

Ballal, T M A and Sher, W D (2003) Artificial neural networks for the selection of buildable structural systems. Engineering, Construction and Architectural Management, 10(04), 263–71.

Bemelmans, J, Voordijk, H and Vos, B (2012) Supplier-contractor collaboration in the construction industry: A taxonomic approach to the literature of the 2000-2009 decade. Engineering, Construction and Architectural Management, 19(04), 342-68.

Benjaoran, V and Bhokha, S (2009) Enhancing visualization of 4D CAD model compared to conventional methods. Engineering, Construction and Architectural Management, 16(04), 392–408.

Bon-Gang, H and Zong Bao, Y (2011) Perception on benefits of construction waste management in the Singapore construction industry. Engineering, Construction and Architectural Management, 18(04), 394–406.

Bonanomi, M M, Hall, D M, Staub-French, S, Tucker, A and Talamo, C M L (2019) The impact of digital transformation on formal and informal organizational structures of large architecture and engineering firms. Engineering, Construction and Architectural Management, 27(04), 872–92.

Broome, J C and Perry, J G (1995) Experiences of the use of the New Engineering Contract. Engineering, Construction and Architectural Management, 2(04), 271–85.

Brown, J and Loosemore, M (2015) Behavioural factors influencing corrupt action in the Australian construction industry. Engineering, Construction and Architectural Management, 22(04), 372-89.

Budayan, C, Dikmen, I and Birgonul, M T (2013) Investigation of drivers and modes of differentiation in Turkish construction industry. Engineering, Construction and Architectural Management, 20(04), 345-64.

Cameron, I, Gillan, G and Duff, A R (2007) Issues in the selection of fall prevention and arrest equipment. Engineering, Construction and Architectural Management, 14(04), 363–74.

Capper, P N (1995) The Adjudicator under NEC 2nd Edition: a new approach to disputes. Engineering, Construction and Architectural Management, 2(04), 317–26.

Carbonara, N, Costantino, N and Pellegrino, R (2016) A transaction costs-based model to choose PPP procurement procedures. Engineering, Construction and Architectural Management, 23(04), 491-510.

Cheng, E W L and Li, H (2001) Development of a conceptual model of construction partnering. Engineering, Construction and Architectural Management, 8(04), 292–303.

Chong, H-Y and Zin, R M (2012) Selection of dispute resolution methods: factor analysis approach. Engineering, Construction and Architectural Management, 19(04), 428-43.

Christodoulou, S (2010) Bid mark-up selection using artificial neural networks and an entropy metric. Engineering, Construction and Architectural Management, 17(04), 424–39.

Collins, F (2013) 2nd generation concrete construction: carbon footprint accounting. Engineering, Construction and Architectural Management, 20(04), 330-44.

Cooke, T, Lingard, H, Blismas, N and Stranieri, A (2008) ToolSHeDUPTM/UP: The development and evaluation of a decision support tool for health and safety in construction design. Engineering, Construction and Architectural Management, 15(04), 336–51.

Dainty, A R J, Ison, S G and Root, D S (2004) Bridging the skills gap: a regionally driven strategy for resolving the construction labour market crisis. Engineering, Construction and Architectural Management, 11(04), 275–83.

Davey, C L, Powell, J A, Cooper, I and Powell, J E (2004) Innovation, construction SMEs and action learning. Engineering, Construction and Architectural Management, 11(04), 230–7.

Dawood, N N and Bates, W (2000) A decision support system specification for out-turn cost and cost escalation in the heavy engineering industry. Engineering, Construction and Architectural Management, 7(04), 330–46.

Dhanasekar, M (2000) Identification of optimal size resources for a repetitive housing construction. Engineering, Construction and Architectural Management, 7(04), 347–61.

Dikmen, I, Birgonul, M T, Ozorhon, B and Sapci, N E (2010) Using analytic network process to assess business failure risks of construction firms. Engineering, Construction and Architectural Management, 17(04), 369–86.

Dursun, O and Stoy, C (2012) Determinants of construction duration for building projects in Germany. Engineering, Construction and Architectural Management, 19(04), 444-68.

Edwards, D J and Holt, G D (2008) Health and safety issues relating to construction excavators and their attachments. Engineering, Construction and Architectural Management, 15(04), 321–35.

Edwards, D J and Holt, G D (2009) New stability field tests for construction excavators. Engineering, Construction and Architectural Management, 16(04), 337–52.

Edwards, P J and Bowen, P A (1998) Risk and risk management in construction: a review and future directions for research. Engineering, Construction and Architectural Management, 5(04), 339–49.

Ejohwomu, O A, Oshodi, O S and Lam, K C (2017) Nigeria’s construction industry: Barriers to effective communication. Engineering, Construction and Architectural Management, 24(04), 652-67.

Eriksson, P E and Laan, A (2007) Procurement effects on trust and control in client-contractor relationships. Engineering, Construction and Architectural Management, 14(04), 387–99.

Fan, C N L, Ho, M H C and Ng, V (2001) Effect of professional socialization on quantity surveyors’ ethical perceptions in Hong Kong. Engineering, Construction and Architectural Management, 8(04), 304–12.

Feghaly, J, El Asmar, M, Ariaratnam, S and Bearup, W (2019) Selecting project delivery methods for water treatment plants. Engineering, Construction and Architectural Management, 27(04), 936–51.

Fellows, R and Liu, A M M (2000) Human dimensions in modelling prices of building projects. Engineering, Construction and Architectural Management, 7(04), 362–72.

Fernie, S and Thorpe, A (2007) Exploring change in construction: supply chain management. Engineering, Construction and Architectural Management, 14(04), 319–33.

Forsythe, P J and Sepasgozar, S M (2019) Measuring installation productivity in prefabricated timber construction. Engineering, Construction and Architectural Management, 26(04), 578–98.

Franck, T, Gérard, S and Régis, B (2011) Method and tools for building maintenance plan arbitration. Engineering, Construction and Architectural Management, 18(04), 343–62.

GhaffarianHoseini, A, Tien, D D, Naismith, N, Tookey, J and GhaffarianHoseini, A (2017) Amplifying the practicality of contemporary building information modelling implementations for New Zealand green building certification (green star). Engineering, Construction and Architectural Management, 24(04), 696-714.

Gorse, C A and Emmitt, S (2003) Investigating interpersonal communication during construction progress meetings: challenges and opportunities. Engineering, Construction and Architectural Management, 10(04), 234–44.

Green, S D (1998) The technocratic totalitarianism of construction process improvement: a critical perspective. Engineering, Construction and Architectural Management, 5(04), 376–86.

Griffith, A and Sidwell, A C (1997) Development of constructability concepts, principles and practices. Engineering, Construction and Architectural Management, 4(04), 295–310.

Halliday, J (1995) Use of the New Engineering Contract in Hong Kong. Engineering, Construction and Architectural Management, 2(04), 307–15.

Hans, V (2011) Construction management research at the interface of design and explanatory science. Engineering, Construction and Architectural Management, 18(04), 334–42.

Ho, P H K (2016) Labour and skill shortages in Hong Kong’s construction industry. Engineering, Construction and Architectural Management, 23(04), 533-50.

Hosny, O, Nassar, K and Esmail, Y (2013) Prequalification of Egyptian construction contractors using fuzzy-AHP models. Engineering, Construction and Architectural Management, 20(04), 381-405.

Howes, R (2000) Improving the performance of Earned Value Analysis as a construction project management tool. Engineering, Construction and Architectural Management, 7(04), 399–411.

Hu, X and Liu, C (2017) Total factor productivity measurement with carbon reduction. Engineering, Construction and Architectural Management, 24(04), 575-92.

Hughes, W (2001) Evaluating plans of work. Engineering, Construction and Architectural Management, 8(04), 272–83.

Ilozor, B D and Ilozor, D B (2006) Open-planning concepts and effective facilities management of commercial buildings. Engineering, Construction and Architectural Management, 13(04), 396–412.

  • Type: Journal Article
  • Keywords: Australia; critical path analysis; management effectiveness; open plan offices
  • ISBN/ISSN: 0969-9988
  • URL: http://www.emeraldinsight.com/10.1108/09699980610680199
  • Abstract:
    Purpose – The purpose of this paper is to demonstrate the effect coefficients of the complex connections between selected open-plan office and effective facilities space management variables. Design/methodology/approach – Data on offices, management control and effective facilities space management measures were collected through questionnaires administered to 102 facilities space managers of 102 randomly selected open-plan offices in Sydney. Findings – Some open-plan attributes were found to have direct impacts on several effective facilities space management variables, while others exhibited indirect effects through management control aspects. In most cases, management control considerably reduced the effect coefficients. Research limitations/implications – While the study is limited to discrete effective facilities space management aspects of only selected open-plan commercial offices in Sydney, the research implications though far-reaching, may not be universally applicable. However, a better understanding of the associations provides directions to where attention would be fruitfully focused in future research replications and practice. Practical implications – The practical implication of this result is for re-engineering of work environments to consider aspects of management that invariably moderates and/or intervenes in the relationship of space, people and work process. This paper concludes that, with dedicated management control, the impact of open-plan on facilities space management may be less extensive. Originality/value – The paper's utilization of this quantitative approach is novel to understanding the connections between office attributes and effective facilities management. This approach offers a veritable alternative to examining and validating these constructs that are useful to space providers, designers, managers and users in understanding the interactions between space, people and process.

Ismail, Z B (2018) Improving contractor social networking on IBS infrastructure maintenance projects: a review. Engineering, Construction and Architectural Management, 25(04), 479–96.

Jayasinghe, R S, Rameezdeen, R and Chileshe, N (2019) Exploring sustainable post-end-of-life of building operations. Engineering, Construction and Architectural Management, 26(04), 689–722.

Jefferies, M, Gameson, R and Rowlinson, S (2002) Critical success factors of the BOOT procurement system: reflections from the Stadium Australia case study. Engineering, Construction and Architectural Management, 9(04), 352–61.

John, G A, Clements-Croome, D J, Fairey, V and Loy, H M (2005) Contextual prerequisites for the application of ILS principles to the building services industry. Engineering, Construction and Architectural Management, 12(04), 307–28.

Jones, K and Kaluarachchi, Y (2007) Operational factors affecting strategic partnering in UK social housing. Engineering, Construction and Architectural Management, 14(04), 334–45.

Kannimuthu, M, Raphael, B, Ekambaram, P and Kuppuswamy, A (2019) Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem. Engineering, Construction and Architectural Management, 27(04), 893–916.

Kanoglu, A (2003) An integrated system for duration estimation in design/build projects and organizations. Engineering, Construction and Architectural Management, 10(04), 272–82.

Karunasena, G and Amaratunga, D (2015) Capacity gaps in post disaster construction and demolition waste management. Engineering, Construction and Architectural Management, 22(04), 446-66.

Kazemi, R M, Riley, D, Asadi, S and Delgoshaei, P (2017) Improving the performance profile of energy conservation measures at the Penn State University Park campus. Engineering, Construction and Architectural Management, 24(04), 610-28.

Khosrowshahi, F (1997) The optimum project duration and cost curve for Hong Kong public housing projects. Engineering, Construction and Architectural Management, 4(04), 249–69.

Konno, Y (2015) Analysing Japanese contractor activity on the basis of panel data. Engineering, Construction and Architectural Management, 22(04), 390-402.

Kululanga, G and Kuotcha, W (2010) Measuring project risk management process for construction contractors with statement indicators linked to numerical scores. Engineering, Construction and Architectural Management, 17(04), 336–51.

Kululanga, G K (2009) Construction process improvement through cognitive power under team generative learning. Engineering, Construction and Architectural Management, 16(04), 307–24.

Kumaraswamy, M M (1996) The pursuit of quality in Hong Kong construction. Engineering, Construction and Architectural Management, 3(04), 289–306.

Kyrö, R, Peltokorpi, A and Luoma-Halkola, L (2019) Connecting adaptability strategies to building system lifecycles in hospital retrofits. Engineering, Construction and Architectural Management, 26(04), 633–47.

Lai, A W Y and Lai, W M (2013) Users’ satisfaction survey on building maintenance in public housing. Engineering, Construction and Architectural Management, 20(04), 420-40.

Lam, K C, Runeson, G, Tam, C M and Lo, S M (1998) Modelling loan acquisition decisions. Engineering, Construction and Architectural Management, 5(04), 359–75.

Lansley, P R (1999) Determinants of performance of UK universities in Built Environment and Town and Country Planning research. Engineering, Construction and Architectural Management, 6(04), 391–402.

Lapp, J A D, Ford, D N, Bryant, J A and Horlen, J (2004) Impacts of CAD on design realization. Engineering, Construction and Architectural Management, 11(04), 284–91.

Li, H, Arditi, D and Wang, Z (2014) Transaction costs incurred by construction owners. Engineering, Construction and Architectural Management, 21(04), 444-58.

Li, J, Yu, M and Wang, H (2018) A taxonomy of performance shaping factors for shield tunnel construction. Engineering, Construction and Architectural Management, 25(04), 574–96.

Lim, B T H, Oo, B L and Ling, F (2010) The survival strategies of Singapore contractors in prolonged recession. Engineering, Construction and Architectural Management, 17(04), 387–403.

Ling, F and Lim, H L (2007) Foreign firms' financial and economic risk in China. Engineering, Construction and Architectural Management, 14(04), 346–62.

Ling, F Y-Y, Ofori, G and Low, S P (2000) Importance of design consultants’ soft skills in design-build projects. Engineering, Construction and Architectural Management, 7(04), 389–98.

Lingard, H, Cooke, T and Gharaie, E (2013) The how and why of plant-related fatalities in the Australian construction industry. Engineering, Construction and Architectural Management, 20(04), 365-80.

Lingard, H, Warmerdam, A and Shooshtarian, S (2019) Getting the balance right. Engineering, Construction and Architectural Management, 26(04), 599–617.

Liu, A M M, Zhang, S and Leung, M (2006) A framework for assessing organisational culture of Chinese construction enterprises. Engineering, Construction and Architectural Management, 13(04), 327–42.

Liu, Y and Mohamed, Y (2012) Modelling industrial construction operations using a multi-agent resource allocation framework. Engineering, Construction and Architectural Management, 19(04), 406-27.

Loosemore, M (1998) Social network analysis: using a quantitative tool within an interpretative context to explore the management of construction crises. Engineering, Construction and Architectural Management, 5(04), 315–26.

Loosemore, M and Lim, B T-H (2016) Intra-organisational injustice in the construction industry. Engineering, Construction and Architectural Management, 23(04), 428-47.

Love, P E D and Edwards, D J (2004) Determinants of rework in building construction projects. Engineering, Construction and Architectural Management, 11(04), 259–74.

Love, P E D, Holt, G D and Li, H (2002) Triangulation in construction management research. Engineering, Construction and Architectural Management, 9(04), 294–303.

Love, P, Davis, P, Ellis, J and Cheung, S O (2010) Dispute causation: identification of pathogenic influences in construction. Engineering, Construction and Architectural Management, 17(04), 404–23.

Lu, W, Zhang, L and Bai, F (2016) Bilateral learning model in construction claim negotiations. Engineering, Construction and Architectural Management, 23(04), 448-63.

Luo, M, Fan, H and Liu, G (2019) Measuring regional differences of construction productive efficiency in China. Engineering, Construction and Architectural Management, 27(04), 952–74.

Ma, H, Liu, Z, Zeng, S, Lin, H and Tam, V W (2019) Does megaproject social responsibility improve the sustainability of the construction industry?. Engineering, Construction and Architectural Management, 27(04), 975–96.

Mahdi, I M, Al-Reshaid, K and Fereig, S M (2006) Optimum house delivery decision model from the Government's and recipients' point-of-view. Engineering, Construction and Architectural Management, 13(04), 413–30.

Mahjoubpour, B, Nasirzadeh, F, Mohammad Hosein Zadeh Golabchi, M, Ramezani Khajehghiasi, M and Mir, M (2018) Modeling of workers’ learning behavior in construction projects using agent-based approach. Engineering, Construction and Architectural Management, 25(04), 559–73.

Mallasi, Z (2019) Designing with pixels: parametric thinking for patterning dynamic building facades. Engineering, Construction and Architectural Management, 26(04), 668–88.

Manley, K and Chen, L (2016) The impact of client characteristics on the time and cost performance of collaborative infrastructure projects. Engineering, Construction and Architectural Management, 23(04), 511-32.

Manowong, E and Ogunlana, S O (2006) Public hearings in Thailand's infrastructure projects: effective participations?. Engineering, Construction and Architectural Management, 13(04), 343–63.

Marsh, L and Flanagan, R (2000) Measuring the costs and benefits of information technology in construction. Engineering, Construction and Architectural Management, 7(04), 423–35.

Martin, L, Florence, T T P, Kevin, D and Umut, O (2011) The politics of sameness in the Australian construction industry: Comparing operative and manager attitudes towards cultural diversity. Engineering, Construction and Architectural Management, 18(04), 363–80.

Matthews, J and Rowlinson, S (1999) Partnering: incorporating safety management. Engineering, Construction and Architectural Management, 6(04), 347–57.

May, D, Wilson, O and Skitmore, M (2001) Bid cutting: an empirical study of practice in South-East Queensland. Engineering, Construction and Architectural Management, 8(04), 250–6.

Mejlænder-Larsen, & (2019) A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects. Engineering, Construction and Architectural Management, 26(04), 648–67.

Mikael, F (2011) Criteria for achieving efficient contractor-supplier relations. Engineering, Construction and Architectural Management, 18(04), 381–93.

Mills, A, Harris, D and Skitmore, M R (2003) The accuracy of housing forecasting in Australia. Engineering, Construction and Architectural Management, 10(04), 245–53.

Motawa, I and Kaka, A (2009) Modelling payment mechanisms for supply chain in construction. Engineering, Construction and Architectural Management, 16(04), 325–36.

Mrad, F, Abdul-Malak, M A, Sadek, S and Khudr, Z (2002) Automated excavation in construction using robotics trajectory and envelop generation. Engineering, Construction and Architectural Management, 9(04), 325–35.

Ndekugri, I and Russell, V (2006) Disputing the existence of a dispute as a strategy for avoiding construction adjudication. Engineering, Construction and Architectural Management, 13(04), 380–95.

Ng, S T, Skitmore, R M and Sharma, T (2001) Towards a human resource information system for Australian construction companies. Engineering, Construction and Architectural Management, 8(04), 238–49.

Ng, S T, Xie, J and Kumaraswamy, M M (2010) Simulating the effect of risks on equity return for concession-based public-private partnership projects. Engineering, Construction and Architectural Management, 17(04), 352–68.

Obonyo, E, Anumba, C and Thorpe, T (2005) APRON: an agent-based specification and procurement system for construction products. Engineering, Construction and Architectural Management, 12(04), 329–50.

Ofori, G (1996) International contractors and structural changes in host country construction industries: case of Singapore. Engineering, Construction and Architectural Management, 3(04), 271–88.

Oluwatayo, A and Amole, D (2012) Characteristics of global architectural firms. Engineering, Construction and Architectural Management, 19(04), 393-405.

Othman, A A E, Hassan, T M and Pasquire, C L (2004) Drivers for dynamic brief development in construction. Engineering, Construction and Architectural Management, 11(04), 248–58.

Panahi, B, Moezzi, E, Preece, C N and Wan, Z W N (2017) Value conflicts and organizational commitment of internal construction stakeholders. Engineering, Construction and Architectural Management, 24(04), 554-74.

Parchami, J M and Shoar, S (2017) A hybrid SD-dematel approach to develop a delay model for construction projects. Engineering, Construction and Architectural Management, 24(04), 629-51.

Peansupap, V and Walker, D H T (2006) Information communication technology (ICT) implementation constraints: A construction industry perspective. Engineering, Construction and Architectural Management, 13(04), 364–79.

Phillips, S, Martin, J, Dainty, A and Price, A (2008) Analysis of the quality attributes used in establishing best value tenders in the UK social housing sector. Engineering, Construction and Architectural Management, 15(04), 307–20.

Potts, K and Wall, M (2002) Managing the commissioning of building services. Engineering, Construction and Architectural Management, 9(04), 336–44.

Price, A D F (2003) The strategy process within large construction organizations. Engineering, Construction and Architectural Management, 10(04), 283–96.

Proverbs, D G and Faniran, O O (2001) International construction performance comparisons: a study of ‘European’ and Australian contractors. Engineering, Construction and Architectural Management, 8(04), 284–91.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of reinforcement fixing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(04), 350–8.

Psilander, K (2002) Axiomatic design in the customizing home building industry. Engineering, Construction and Architectural Management, 9(04), 318–24.

Rahmani, F, Maqsood, T and Khalfan, M (2017) An overview of construction procurement methods in Australia. Engineering, Construction and Architectural Management, 24(04), 593-609.

rgensen, B and Emmitt, S (2008) Lost in transition: the transfer of lean manufacturing to construction. Engineering, Construction and Architectural Management, 15(04), 383–98.

Rogers, J, Chong, H-Y and Preece, C (2015) Adoption of building information modelling technology: Perspectives from Malaysian engineering consulting services firms. Engineering, Construction and Architectural Management, 22(04), 424-45.

Rooke, J D and Seymour, D E (1995) The NEC and the culture of the industry: some early findings regarding possible sources of resistance to change. Engineering, Construction and Architectural Management, 2(04), 287–305.

Rwelamila, P D, Talukhaba, A A and Ngowi, A B (1999) Tracing the African Project Failure Syndrome: the significance of 'ubuntu'. Engineering, Construction and Architectural Management, 6(04), 335–46.

Sangki, K, Sanghyo, L and Jaejun, K (2011) Relationship between the financial crisis of Korean construction firms and macroeconomic fluctuations. Engineering, Construction and Architectural Management, 18(04), 407–22.

Sarshar, M and Isikdag, U (2004) A survey of ICT use in the Turkish construction industry. Engineering, Construction and Architectural Management, 11(04), 238–47.

Shahsavand, P, Marefat, A and Parchamijalal, M (2018) Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering, Construction and Architectural Management, 25(04), 497–533.

Shang, H, Anumba, C J, Bouchlaghem, D M, Miles, J C, Cen, M and Taylor, M (2005) An intelligent risk assessment system for distributed construction teams. Engineering, Construction and Architectural Management, 12(04), 391–409.

Silva, N D and Wimalaratne, P L I (2012) OSH management framework for workers at construction sites in Sri Lanka. Engineering, Construction and Architectural Management, 19(04), 369-92.

Smith, J M, Kenley, R and Wyatt, R (1998) Evaluating the client briefing problem: an exploratory study. Engineering, Construction and Architectural Management, 5(04), 387–98.

Tah, J H M, V, C and Howes, R (1998) An application of case-based reasoning to the planning of highway bridge construction. Engineering, Construction and Architectural Management, 5(04), 327–38.

Tam, V W Y and Zeng, S X (2014) Employee job satisfaction in engineering firms. Engineering, Construction and Architectural Management, 21(04), 353-68.

Teo, E A L, Ling, F Y Y and Ong, D S Y (2005) Fostering safe work behaviour in workers at construction sites. Engineering, Construction and Architectural Management, 12(04), 410–22.

Toor, S-u-R and Ofori, G (2008) Taking leadership research into future: A review of empirical studies and new directions for research. Engineering, Construction and Architectural Management, 15(04), 352–71.

Trangkanont, S and Charoenngam, C (2014) Critical failure factors of public-private partnership low-cost housing program in Thailand. Engineering, Construction and Architectural Management, 21(04), 421-43.

Ugwu, O O and Tah, H M (2002) Development and application of a hybrid genetic algorithm for resource optimization and management. Engineering, Construction and Architectural Management, 9(04), 304–17.

Underwood, J, Alshawi, M A, Aouad, G F, Child, T and Faraj, I Z (2000) Enhancing building product libraries to enable the dynamic definition of design element specifications. Engineering, Construction and Architectural Management, 7(04), 373–88.

Upstill-Goddard, J, Glass, J, Dainty, A and Nicholson, I (2016) Implementing sustainability in small and medium-sized construction firms: The role of absorptive capacity. Engineering, Construction and Architectural Management, 23(04), 407-27.

Viles, E, Rudeli, N C and Santilli, A (2019) Causes of delay in construction projects: a quantitative analysis. Engineering, Construction and Architectural Management, 27(04), 917–35.

Wang, D, Fang, S and Li, K (2019) Dynamic changes of governance mechanisms in mega construction projects in China. Engineering, Construction and Architectural Management, 26(04), 723–35.

Wang, S, Tang, J, Zou, Y and Zhou, Q (2019) Research on production process optimization of precast concrete component factory based on value stream mapping. Engineering, Construction and Architectural Management, 27(04), 850–71.

Whyte, J, Bouchlaghem, N, Thorpe, A and Mccaffer, R (1999) A survey of CAD and virtual reality within the house building industry. Engineering, Construction and Architectural Management, 6(04), 371–9.

Wibowo, A and Alfen, H W (2013) Fine-tuning the value and cost of capital of risky PPP infrastructure projects. Engineering, Construction and Architectural Management, 20(04), 406-19.

Wibowo, A and Alfen, H W (2014) Identifying macro-environmental critical success factors and key areas for improvement to promote public-private partnerships in infrastructure: Indonesia's perspective. Engineering, Construction and Architectural Management, 21(04), 383-402.

Wild, A (2002) The unmanageability of construction and the theoretical psycho-social dynamics of projects. Engineering, Construction and Architectural Management, 9(04).

Wirba, E N, Tah, J H M and Howes, R (1996) Risk interdependencies and natural language computations. Engineering, Construction and Architectural Management, 3(04), 251–69.

Wong, C H, Holt, G D and Harris, P (2001) Multi-criteria selection or lowest price? Investigation of UK construction clients’ tender evaluation preferences. Engineering, Construction and Architectural Management, 8(04), 257–71.

Wong, J K W and Lin, A H Q (2014) Construction workplace discrimination: Experiences of ethnic minority operatives in Hong Kong construction sites. Engineering, Construction and Architectural Management, 21(04), 403-20.

Wood, G D and Ellis, R C T (2003) Risk management practices of leading UK cost consultants. Engineering, Construction and Architectural Management, 10(04), 254–62.

Ye, S and Tiong, R K L (2000) Government support and risk-return trade-off in China's BOT power projects. Engineering, Construction and Architectural Management, 7(04), 412–22.

Zhang, H and Tam, C M (2005) Consideration of break in modeling of construction processes. Engineering, Construction and Architectural Management, 12(04), 373–90.

Zhang, W R, Wang, S Q, Tiong, R L K, Ting, S K and Ashley, D (1998) Risk management of Shanghai's privately financed Yan'an Donglu tunnels. Engineering, Construction and Architectural Management, 5(04), 399–410.