Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 117 results ...

Adriaanse, A, Voordijk, H and Dewulf, G (2010) The use of interorganisational ICT in construction projects: a critical perspective. Construction Innovation, 10(02), 223–37.

Ahuja, V, Yang, J, Skitmore, M and Shankar, R (2010) An empirical test of causal relationships of factors affecting ICT adoption for building project management: An Indian SME case study. Construction Innovation, 10(02), 164–80.

Al Yahya, M, Skitmore, M, Bridge, A, Nepal, M and Cattell, D (2018) e-Tendering readiness in construction: the posterior model. Construction Innovation, 18(02), 0.

Al-Hussein, M, Alkass, S and Moselhi, O (2001) An algorithm for mobile crane selection and location on construction sites. Construction Innovation, 1(02), 91–105.

Alwan, Z, Greenwood, D and Gledson, B (2015) Rapid LEED evaluation performed with BIM-based sustainability analysis on a virtual construction project. Construction Innovation, 15(02), 134-50.

Antwi-Afari, M F, Li, H, Edwards, D J, Pärn, E A, Owusu-Manu, D, Seo, J and Wong, A Y L (2018) Identification of potential biomechanical risk factors for low back disorders during repetitive rebar lifting. Construction Innovation, 18(02), 0.

Arif, M, Bendi, D, Toma-Sabbagh, T and Sutrisna, M (2012) Construction waste management in India: an exploratory study. Construction Innovation, 12(02), 133-55.

Atkin, B and Bildsten, L (2017) A future for facility management. Construction Innovation, 17(02), 116-24.

Atta, A, Ali, N, Taman, M and Etman, E (2018) Improvement the structural behavior of recycled RC elements using CdO nanoparticles. Construction Innovation, 18(02), 134–51.

Ayinla, K O, Cheung, F and Tawil, A (2019) Demystifying the concept of offsite manufacturing method. Construction Innovation , 20(02), 223–46.

Bashouri, J and William, D G (2014) A model for sharing knowledge in architectural firms. Construction Innovation, 14(02), 168-85.

Belayutham, S, Che Ibrahim, C K I, Zulkifli, A R and Ibrahim, N (2019) A dual-functional social innovation process model for low-cost houses through university-enabled initiative. Construction Innovation , 19(02), 126–48.

Beran, V, Dlask, P, Eaton, D, Hromada, E and Zindulka, O (2011) Mapping of synchronous activities through virtual management momentum simulation. Construction Innovation, 11(02), 190–211.

Bichard, E and Thurairajah, N (2013) Behaviour change strategies for energy efficiency in owner-occupied housing. Construction Innovation, 13(02), 165-85.

Björnfot, A and Jongeling, R (2007) Application of line-of-balance and 4D CAD for lean planning. Construction Innovation, 7(02), 200–11.

Bowen, P, Jay, I, Cattell, K and Edwards, P (2010) Value management awareness and practice by South African architects: an empirical study. Construction Innovation, 10(02), 203–22.

Bower, D J, Hinks, J, Wright, H, Hardcastle, C and Cuckow, H (2001) ICTs, videoconferencing and the construction industry: opportunity or threat?. Construction Innovation, 1(02), 129–44.

Brahme, R and Mahdavi, A (2003) Complex early design inquiries via generative design agents. Construction Innovation, 3(02), 81–95.

Brewer, G and Gajendran, T (2012) Attitudes, behaviours and the transmission of cultural traits: Impacts on ICT/BIM use in a project team. Construction Innovation, 12(02), 198-215.

Carmichael, D G and Mustaffa, N K (2018) Emissions and production penalties/bonuses associated with non-standard earthmoving loading policies. Construction Innovation, 18(02), 0.

Chantawit, D, Hadikusumo, B H W, Charoenngam, C and Rowlinson, S (2005) 4DCAD-Safety: visualizing project scheduling and safety planning. Construction Innovation, 5(02), 99–114.

Chen, L and Mohamed, S (2010) The strategic importance of tacit knowledge management activities in construction. Construction Innovation, 10(02), 138–63.

Chen, Y, Dib, H and Cox, R F (2014) A measurement model of building information modelling maturity. Construction Innovation, 14(02), 186-209.

Cheng, E W L, Li, H and Yu, L (2005) The analytic network process (ANP) approach to location selection: a shopping mall illustration. Construction Innovation, 5(02), 83–97.

Cheung, S-O, Ng, S T, Lam, K-C and Sin, W-S (2001) A fuzzy sets model for construction dispute evaluation. Construction Innovation, 1(02), 117–27.

Choudhari, S and Tindwani, A (2017) Logistics optimisation in road construction project. Construction Innovation, 17(02), 158-79.

Dowsett, R, Green, M, Sexton, M and Harty, C (2019) Projecting at the project level: MMC supply chain integration roadmap for small housebuilders. Construction Innovation, 19(02), 193–211.

Eaton, D, Akbiyikli, R and Dickinson, M (2006) An evaluation of the stimulants and impediments to innovation within PFI/PPP projects. Construction Innovation, 6(02), 63–7.

Echeverria-Valiente, E, Garcia-Alvarado, R, Celis-D’Amico, F and Saelzer-Fuica, G (2019) Integrated design experiences for energy-efficient housing in Chile. Construction Innovation , 19(02), 236–55.

El-Ghandour, W and Al-Hussein, M (2004) Survey of information technology applications in construction. Construction Innovation, 4(02), 83–98.

Finne, C (2006) Publishing building product information: a value net perspective. Construction Innovation, 6(02), 79–96.

Florez, L, Castro, D and Irizarry, J (2013) Measuring sustainability perceptions of construction materials. Construction Innovation, 13(02), 217-34.

Fu, E, Newell, D, Becker, A, Schwegler, B and Fischer, M (2013) Is adaptation sustainable? A method to estimate climate-critical construction resource capacity. Construction Innovation, 13(02), 202-16.

Gajendran, T and Brewer, G (2012) Cultural consciousness and the effective implementation of information and communication technology. Construction Innovation, 12(02), 179-97.

Gledson, B J (2016) Hybrid project delivery processes observed in constructor BIM innovation adoption. Construction Innovation, 16(02), 229-46.

Gledson, B J and Phoenix, C (2017) Exploring organisational attributes affecting the innovativeness of UK SMEs. Construction Innovation, 17(02), 224-43.

Golizadeh, H, Hosseini, M R, Edwards, D J, Abrishami, S, Taghavi, N and Banihashemi, S (2019) Barriers to adoption of RPAs on construction projects: a task–technology fit perspective. Construction Innovation, 19(02), 149–69.

Habets, T, Voordijk, H and Sijde, P v d (2011) The adoption of innovative asphalt equipment in road construction. Construction Innovation, 11(02), 229–45.

  • Type: Journal Article
  • Keywords: innovation; knowledge management; roads
  • ISBN/ISSN: 1471-4175
  • URL: https://doi.org/10.1108/14714171111124185
  • Abstract:
    Purpose – The purpose of this paper is to provide insight into the adoption process of innovative asphalt equipment in road construction and how the level of knowledge as characterised by the level of education in the companies affects this process. The emphasis is on equipment used for transporting asphalt from asphalt plant to construction site or at the construction site itself. It is assumed that the uptake of this equipment is influenced by the radicality of the innovation and the company's level of education. Design/methodology/approach – In this research, the innovation behaviour of construction companies is assessed through a case study, an expert opinion, and an industry survey (of which 55 per cent of the total population participated). Findings – The results show that on average, experts and companies alike give more radical equipment innovations less adoption chances. Companies prefer to make minor improvements and perceive no benefits in implementing a risky radical equipment innovation. Companies that have a higher level of knowledge are found to show a more positive and professional attitude towards implementing innovative asphalt equipment. Research limitations/implications – The defined knowledge is restricted to the formal level of education of both management and the firm in one part of the construction industry. The knowledge indicator used in this study has a high validity (it is easy to measure). Further research could focus on other types of knowledge affecting innovation adoption in other parts of the construction industry. Originality/value – The value of this study is that it addresses the important questions of how managers of construction firms select equipment and how it is affected by the level of knowledge.

Hamidavi, T, Abrishami, S, Ponterosso, P, Begg, D and Nanos, N (2020) OSD. Construction Innovation , 20(02), 149–69.

Hemström, K, Mahapatra, K and Gustavsson, L (2017) Architects’ perception of the innovativeness of the Swedish construction industry. Construction Innovation, 17(02), 244-60.

Hosseini, M R, Chileshe, N, Zuo, J and Baroudi, B (2015) Adopting global virtual engineering teams in AEC projects: A qualitative meta-analysis of innovation diffusion studies. Construction Innovation, 15(02), 151-79.

Hughes, R and Thorpe, D (2014) A review of enabling factors in construction industry productivity in an Australian environment. Construction Innovation, 14(02), 210-28.

Igo, T and Skitmore, M (2006) Diagnosing the organizational culture of an Australian engineering consultancy using the competing values framework. Construction Innovation, 6(02), 121–39.

Irani, Z (2008) Information systems evaluation: what does it mean?. Construction Innovation, 8(02), 88–91.

Jansson, G, Lundkvist, R and Olofsson, T (2015) The role of experience feedback channels in the continuous development of house-building platforms. Construction Innovation, 15(02), 236-55.

Jingmond, M and Ågren, R (2015) Unravelling causes of defects in construction. Construction Innovation, 15(02), 198-218.

Jørgensen, B and Emmitt, S (2009) Investigating the integration of design and construction from a “lean” perspective. Construction Innovation, 9(02), 225–40.

Kähkönen, K E E (2015) Role and nature of systemic innovations in construction and real estate sector. Construction Innovation, 15(02), 130-3.

Karan, E, Irizarry, J and Haymaker, J (2015) Generating IFC models from heterogeneous data using semantic web. Construction Innovation, 15(02), 219-35.

Kennedy, R and Sidwell, A C (2001) Re-engineering the construction delivery process: The Museum of Tropical Queensland, Townsville – A Case Study. Construction Innovation, 1(02), 77–89.

Khan, M W and Ali, Y (2020) Sustainable construction. Construction Innovation , 20(02), 191–207.

Lam, P T I, Wong, F W H, Chan, A P C, Shea, W C Y and Lau, J W S (2012) A scheme design buildability assessment model for building projects. Construction Innovation, 12(02), 216-38.

Lenderink, B, Halman, J I, Boes, H and Voordijk, H (2020) A method to encourage and assess innovations in public tenders for infrastructure and construction projects. Construction Innovation , 20(02), 171–89.

Li, H, Chen, Z, Wong, C T C and Love, P E D (2002) A quantitative approach to construction pollution control based on resource levelling. Construction Innovation, 2(02), 71–81.

Linner, T and Bock, T (2012) Evolution of large-scale industrialisation and service innovation in Japanese prefabrication industry. Construction Innovation, 12(02), 156-78.

Love, P E D, Huang, J C, Edwards, D J and Irani, Z (2004) Nurturing a learning organization in construction: a focus on strategic shift, organizational transformation, customer orientation and quality centered learning. Construction Innovation, 4(02), 113–26.

Maghrebi, M, Shamsoddini, A and Waller, S T (2016) Fusion-based learning approach for predicting concrete pouring productivity based on construction and supply parameters. Construction Innovation, 16(02), 185-202.

Mah, D, Manrique, J D, Yu, H, Al-Hussein, M and Nasseri, R (2011) House construction CO2 footprint quantification: a BIM approach. Construction Innovation, 11(02), 161–78.

Mahamadu, A, Mahdjoubi, L, Booth, C, Manu, P and Manu, E (2019) Building information modelling (BIM) capability and delivery success on construction projects. Construction Innovation, 19(02), 170–92.

Mak, S W K, Choy, L H T and Ho, W K O (2008) Hedonic models, internet-based technologies, and the provision of online property appraisal. Construction Innovation, 8(02), 92–105.

Marasini, R and Dawood, N (2006) Innovative managerial control system (IMCS): an application in precast concrete building products industry. Construction Innovation, 6(02), 97–120.

Marzouk, M and Moamen, M (2009) A framework for estimating negotiation amounts in construction projects. Construction Innovation, 9(02), 133–48.

Marzouk, M and Moselhi, O (2003) A decision support tool for construction bidding. Construction Innovation, 3(02), 111–24.

McCoy, A P, Thabet, W and Badinelli, R (2008) Towards establishing a domain specific commercialization model for innovation in residential construction. Construction Innovation, 8(02), 137–55.

Memon, Z A, Abd.Majid, M Z and Mustaffar, M (2007) A systematic procedure for developing the 3D model to evaluate the construction project progress. Construction Innovation, 7(02), 187–99.

Mezher, T (2011) Building future sustainable cities: the need for a new mindset. Construction Innovation, 11(02), 136–41.

Mezher, T, Abdul-Malak, M A, Arnaout, S and Bassil, Z (2004) Public Project Programming System (3PS): a decision support system for public sector investment. Construction Innovation, 4(02), 99–111.

Miller, A, Radcliffe, D and Isokangas, E (2009) A perception-influence model for the management of technology implementation in construction. Construction Innovation, 9(02), 168–83.

Mock, B and O’Connor, J T (2019) Owner and contractor solution strategies for industrial commissioning. Construction Innovation , 19(02), 256–79.

Mohammed, A A and Abdul-Rahman, H (2014) Aspects of project learning in construction: A socio-technical model. Construction Innovation, 14(02), 229-44.

Nadim, W and Goulding, J S (2010) Offsite production in the UK: the way forward? A UK construction industry perspective. Construction Innovation, 10(02), 181–202.

Nahmens, I and Reichel, C (2013) Adoption of high performance building systems in hot-humid climates – lessons learned. Construction Innovation, 13(02), 186-201.

Newton, S (2009) New directions in leadership. Construction Innovation, 9(02), 129–32.

Ng, S T and Xie, J (2008) A simulation model for evaluating the tariff stability of concession-based PPP proposals. Construction Innovation, 8(02), 106–19.

Obonyo, E A (2011) An agent-based intelligent virtual learning environment for construction management. Construction Innovation, 11(02), 142–60.

Omar, E A A and Mangin, J-C (2002) A new cost control model and indicators to measure productivity on building sites. Construction Innovation, 2(02), 83–101.

Osei-Kyei, R and Chan, A P C (2017) Risk assessment in public-private partnership infrastructure projects: Empirical comparison between Ghana and Hong Kong. Construction Innovation, 17(02), 204-23.

Pekuri, A, Pekuri, L and Haapasalo, H (2015) Business models and project selection in construction companies. Construction Innovation, 15(02), 180-97.

Pilgrim, M, Bouchlaghem, D, Loveday, D and Holmes, M (2002) Towards best practice in building analysis data representation. Construction Innovation, 2(02), 117–30.

Pitt, M, Tucker, M, Riley, M and Longden, J (2009) Towards sustainable construction: promotion and best practices. Construction Innovation, 9(02), 201–24.

Razavi, S N, Montaser, A and Moselhi, O (2012) RFID deployment protocols for indoor construction. Construction Innovation, 12(02), 239-58.

Rose, T, Manley, K and Widen, K (2019) Do firm-level barriers to construction product innovation adoption vary according to position in the supply chain?. Construction Innovation , 19(02), 212–35.

Rustom, R N and Yahia, A (2007) Estimating productivity using simulation: A case study of Gaza beach embankment protection project. Construction Innovation, 7(02), 167–86.

Saka, A B and Chan, D W (2020) Profound barriers to building information modelling (BIM) adoption in construction small and medium-sized enterprises (SMEs). Construction Innovation , 20(02), 261–84.

Sarhan, J, Xia, B, Fawzia, S, Karim, A and Olanipekun, A (2018) Barriers to implementing lean construction practices in the Kingdom of Saudi Arabia (KSA) construction industry. Construction Innovation, 18(02), 246–72.

Sariola, R (2018) Utilizing the innovation potential of suppliers in construction projects. Construction Innovation, 18(02), 0.

Sarshar, M, Haigh, R and Amaratunga, D (2004) Improving project processes: best practice case study. Construction Innovation, 4(02), 69–82.

Sergeeva, N and Liu, N (2019) Social construction of innovation and the role of innovation brokers in the construction sector. Construction Innovation , 20(02), 247–59.

Sharp, M (2010) Simple solutions to complex issues in the built environment. Construction Innovation, 10(02), 121–5.

Shokri-Ghasabeh, M and Chileshe, N (2016) Critical factors influencing the bid/no bid decision in the Australian construction industry. Construction Innovation, 16(02), 127-57.

Sidwell, A C, Budiawan, D and Ma, T (2001) The significance of the tendering contract on the opportunities for clients to encourage contractorled innovation. Construction Innovation, 1(02), 107–16.

Singh, A (2012) Engineering mixes with politics. Construction Innovation, 12(02), 128-32.

Sivunen, M, Pulkka, L, Heinonen, J, Kajander, J-K and Junnila, S (2013) Service-dominant innovation in the built environment. Construction Innovation, 13(02), 146-64.

Straub, A (2011) Maintenance contractors acting as service innovators. Construction Innovation, 11(02), 179–89.

Tam, C M and Tong, T K L (2005) Multiple GMDH models for estimating resource requirements. Construction Innovation, 5(02), 115–31.

Tam, C-M and Tong, T K L (2008) Locating large-scale harbour-front project developments using SIR method with grey aggregation approach. Construction Innovation, 8(02), 120–36.

Tam, V W Y, Shen, L Y, Fung, I W H and Wang, J Y (2007) Controlling construction waste by implementing governmental ordinances in Hong Kong. Construction Innovation, 7(02), 149–66.

Teriö, O, Sorri, J, Kähkönen, K and Hämäläinen, J (2014) Environmental index for Finnish construction sites. Construction Innovation, 14(02), 245-62.

Teriö, O, Sorri, J, Kähkönen, K and Hämäläinen, J (2014) Environmental index for Finnish construction sites. Construction Innovation, 14(02), 245-62.

Tezel, A and Aziz, Z (2017) Benefits of visual management in construction: Cases from the transportation sector in England. Construction Innovation, 17(02), 125-57.

Thorpe, D (2003) Online Remote Construction Management trials in Queensland Department of Main Roads: a participant’s perspective. Construction Innovation, 3(02), 65–79.

Thorpe, D, Ryan, N and Charles, M B (2009) Innovation and small residential builders: an Australian study. Construction Innovation, 9(02), 184–200.

Titus, S and Bröchner, J (2005) Managing information flow in construction supply chains. Construction Innovation, 5(02), 71–82.

Toor, S-u-R and Ogunlana, S O (2009) Construction professionals' perception of critical success factors for large-scale construction projects. Construction Innovation, 9(02), 149–67.

Tsehayae, A A and Fayek, A R (2016) System model for analysing construction labour productivity. Construction Innovation, 16(02), 203-28.

Tseng, A A, Tanaka, M, Leeladharan, B and Choi, J G (2003) Rotating laser-based system for full profile measurement. Construction Innovation, 3(02), 97–110.

Turkan, Y, Bosché, F, Haas, C T and Haas, R (2014) Tracking of secondary and temporary objects in structural concrete work. Construction Innovation, 14(02), 145-67.

Utomo, C and Rahmawati, Y (2020) Agreement options for negotiation on material location decision of housing development. Construction Innovation , 20(02), 209–22.

Van Oorschot, J A, Halman, J I and Hofman, E (2020) Getting innovations adopted in the housing sector. Construction Innovation , 20(02), 285–318.

Vennström, A and Eriksson, P E (2010) Client perceived barriers to change of the construction process. Construction Innovation, 10(02), 126–37.

Vidalakis, C, Tookey, J E and Sommerville, J (2011) Logistics simulation modelling across construction supply chains. Construction Innovation, 11(02), 212–28.

Walker, D H T (2016) Reflecting on 10 years of focus on innovation, organisational learning and knowledge management literature in a construction project management context. Construction Innovation, 16(02), 114-26.

Walker, D H T and Rahmani, F (2016) Delivering a water treatment plant project using a collaborative project procurement approach. Construction Innovation, 16(02), 158-84.

Wang, Z and Rezazadeh Azar, E (2019) BIM-based draft schedule generation in reinforced concrete-framed buildings. Construction Innovation , 19(02), 280–94.

Weippert, A, Kajewski, S L and Tilley, P A (2002) Internet-based information and communication systems on remote construction projects: a case study analysis. Construction Innovation, 2(02), 103–16.

Zaher, M, Greenwood, D and Marzouk, M (2018) Mobile augmented reality applications for construction projects. Construction Innovation, 18(02), 152–66.

Zeb, J and Froese, T (2017) Transaction formalism protocol tool in infrastructure management. Construction Innovation, 17(02), 180-203.